Response: - Information on TES species occurrence has been reviewed and updated, as appropriate, with <br />reference to the most recent USFWS and CPW TES species lists. If updates were necessary, the updated <br />materials accompany these responses for insertion/replacement in the PAP. <br />2.05.3 Operations Plan - Permit Area <br />24. Map 23 shows operations continuing through 2018. Please update Table 46 to show the anticipated annual <br />and total production for future operations at the Foidel Creek Mine in accordance with Rule 2.05.3(1). <br />Response: - Note that Map 23B, submitted with the approved Permit Revision PRI 5-11, shows mining through <br />2023. Both the referenced map and table have been reviewed and updated to reflect future mining plans. The <br />updated materials accompany these responses for insertion/replacement in the PAP (note that Table 46 is <br />"Confidential"). <br />25. Page 2.05-13-1 discusses the areal extent of the area affected by underground mining at the site. The page <br />indicates that 13,090 acres have been affected by mining in the Southwestern, Western, Northern and Eastern <br />Mining district. However, if you add tip the acreages listed for each of the districts that total is 13,700 acres. <br />Please clarify this discrepancy and re-evaluate and update the affected acreages listed on this page. <br />Response: - The referenced page was revised and approved as part of the PR14-10 revision application. The <br />revised page (copy included for reference with these responses) reflected all planned disturbance at that time <br />(13,814 acres). In the interim, approved revisions have added approximately 20 acres of surface disturbance, so <br />the referenced page has been updated to include this additional area. The updated page accompanies these <br />responses for insertion/replacement in the PAP. <br />26. Please provide a map made in accordance with Rule 2.10 that depicts the final location of the WCR <br />Coreholes and the location of anv road that was cut to access the corehole sites. Please update the respective <br />pages in Section 2.05 of the permit to discuss the final locations of these coreholes and cite the location where <br />the new map can be found. <br />Response: - As noted, a number of drillholes were permitted to delineate and characterize the Wolf Creek <br />Reserve. Most of the permitted drillholes were completed, however, there are some of the permitted drillholes <br />which have not yet been drilled, and there is still the possibility that some of them may be drilled in the future. <br />Maps 24 and 29, show all mine -related disturbance, and have been reviewed and revised, as appropriate, to assure <br />that they show all drillholes and related disturbance. The related text has also been reviewed and revised, as <br />appropriate for consistency. The updated materials accompany these responses for replacement in the PAP. <br />27. The Division could not locate permanent sealing/abandonment reports for the exploration coreholes for the <br />Western Mining District discussed on pages 2.05-17 to 17.3. Please provide abandonment reports for these <br />coreholes with the information required under Rule 4.07.3. <br />Response: - The referenced abandonment reports accompany these responses for insertion in the PAP. <br />28. Please update page 2.05-11.1 to 11.2 to list the following mine openings: Compressor Building Boreholes <br />(1&2), WMD Stabilization Borehole, 15 -Left Ventilation Shaft, 16 -Left Utility Borehole, 5 -Main North <br />Borehole, 10 -East Emergency Air Borehole, 10 -Right Monitoring Borehole, NMD Power Borehole. <br />Response: - The referenced listing has been reviewed and updated, as appropriate to include all current mine <br />openings. Note that the Compressor Building boreholes are included in the 6 -Main North utility boreholes (7), <br />the WMD Stabilization Borehole is already listed as the 17 -Left Cement Borehole, the 16 -Left Borehole is <br />already listed, and the NMD Power Borehole is already listed as the Substation 11 Power -Drop Borehole. The <br />updated Permit text accompanies these responses for replacement in the PAP. <br />29. The Division reviewed Section 2.05.3(3)(a)(b) of the permit. This Section contains an extensive list of the <br />surface facilities/projects at the site. Many of the surface facilities listed do not provide a clear description of <br />the location and simply cite that the facility/area is depicted on Map 24. The location of many of these <br />