My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_REVISION - M1977559
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977559
>
2018-03-30_REVISION - M1977559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:42 PM
Creation date
3/30/2018 3:31:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977559
IBM Index Class Name
REVISION
Doc Date
3/30/2018
Doc Name
Request for Technical Revision
From
Steve Lindner
To
DRMS
Type & Sequence
TR5
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.Co <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1876* * 1313 Sherman Street Room 215 Denver,Colorado 80203 h 303 866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1977-559 site Name:Canon City East Pit (MacKenzie Pit) <br /> County Fremont TR# (DRMS Use only) <br /> Permittee: South Forty Recreation LLC M-1 977-559 - T <br /> Complied! ft-010 90 <br /> OS <br /> Operator(If Other than Permittee): NO Steve Lindner VIOIatI0f1S <br /> Permittee Representative: tot. whe MAR0 2018 <br /> Please provide a brief description of the proposed revision: DIVISION OF RECLAMATION <br /> Allow existing shop building and concrete storage bunkers to remain, as further describk8ff AND SAFETY <br /> Attaehmeflts 1 ;here•. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tvue Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.