Laserfiche WebLink
Dust will be controlled by both magnesium chloride and water. Water will only be used to spot <br /> water between applications of magnesium chloride in order to eliminate any problem dust areas. <br /> 3.0 acre-feet per year will be allocated to dust control, or 0.25 acre-feet per month. <br /> Therefore,total annual depletions for the gravel mining operations are estimated to be 7.08 acre- <br /> feet per year. <br /> Base Products Gravel Pit 41 <br /> February 2018 G-3 <br />