My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-29_PERMIT FILE - M1994053
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1994053
>
2018-03-29_PERMIT FILE - M1994053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:10 PM
Creation date
3/29/2018 3:02:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994053
IBM Index Class Name
PERMIT FILE
Doc Date
3/29/2018
Doc Name Note
Amendment to Application
Doc Name
Application
From
Rock Pile, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Truck scales <br /> - Mine office <br /> - A portable crusher with associated tanks <br /> - A portable wash plant with associated tanks <br /> Wash plant recycle pond <br /> - 5000 gallon fuel tank in secondary containment(110% of tank capacity) <br /> - Portable lights with a generator for emergency after hours maintenance support <br /> The following list is the best estimate as to the equipment which will be used onsite throughout <br /> the mine life: <br /> - 2-3 Front end loaders <br /> - 1 D-8 Bulldozer <br /> - 1 40G Motor grader <br /> - 14000 gallon water truck <br /> - off-highway road haul trucks (number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> All fuel tanks will have secondary containment. Some are double walled, others will be located <br /> within bermed or lined areas that have over 110% of the volume of the largest stored tank. All <br /> such tanks will be kept at the office area immediately southwest of Pit 1. See Map C-2. <br /> No night mining activity is scheduled for the operation; however portable lighting may be used <br /> within the pit from time to time. The portable lights will only be used at the bottom of the pit for <br /> the purpose of after hour equipment maintenance and crushing activities within the permitted hours <br /> in the winter months while the days are shorter. Portable toilets will be used for employees. All <br /> mining structures on site are shown on Map C-2. The portable mining equipment such as loaders, <br /> dozers,trucks and excavators will be serviced on an as-needed basis onsite. Upon reclamation,all <br /> portable equipment will be removed from the site. <br /> There will be no new fence around the operation, since it is inside private property. No problems <br /> are expected with vandalism. It is extremely unlikely that any toxic or acid-producing materials <br /> will be encountered during the mining operation since the past mining shows that the material is <br /> alluvial in nature. However, in the event that such materials are encountered,they will be covered <br /> Base Products Gravel Pit 41 <br /> February 2018 D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.