2. Mining Timetable <br /> The following timetable is a best estimate of the sequence of operations for the life of the mine <br /> after May 2017 and is based on mining and selling 200,000 tons of total product per year: <br /> Table D-1 Mining Timetable <br /> Area Mining Time Material Quantity <br /> 1 7 Years 1,417,441 Tons <br /> 2 11 Years 2,183,873 Tons <br /> 3 6 Years 1,167,979 Tons <br /> 4 6 Years 1,193,042 Tons <br /> 5 7 Years 1,304,073 Tons <br /> 6 6 Years 1,252,280 Tons <br /> 7 5 Years 1,030,320 Tons <br /> 8 7 Years 1,477,586 Tons <br /> 9 6 Years 1,291,700 Tons <br /> 10 11 Years 2,104,739 Tons <br /> Total 72 Years 14,423,033 Tons <br /> The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br /> mining is undertaken. Note: If large contracts are awarded to the site, production could increase <br /> to the permit maximum, thereby curtailing the life of the pit. On the other hand, if contracts are <br /> less than anticipated, the life of the pit could be extended. This table is based on a reasonable <br /> projection of average production rates. <br /> 3. Mine Facilities and Operation <br /> The site will contain the following facilities, it is noted where applicable whether or not the <br /> facility is portable and whether it will have any fuel storage associated with it. A summary of <br /> equipment and related tanks is shown below. <br /> - A portable asphalt plant with associated tanks (permitted with Montrose County) <br /> - A concrete plant with associated tanks <br /> Base Products Gravel Pit 41 <br /> February 2018 D-3 <br />