My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-26_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 8:42:37 AM
Creation date
3/27/2018 7:31:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/26/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR118
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip 29,458'of Collom Haul Road <br />Site: Colowyo Coal Mne Permit Action: 13C (TRI 18) <br />PROJECT IDENTIFICATION <br />Task#: <br />Date: <br />User: <br />003 State: Colorado <br />3/13/2018 County: Moffat <br />ZTT <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO19-003 <br />Agency or organization name: <br />DRMS <br />feet/second <br />HOURLY EQUIPMENT COST <br />Basic Machine: OBSOLETE - Cat D11R - <br />Horsepower: 850 <br />1 1S <br />Average Ripping Width: <br />7.94 <br />Ripper Attachment: 1-ShankRipper <br />Average Ripping Length: <br />Shift Basis: 1 per day <br />feet <br />Average Dozer Speed: <br />Data Source: (CRG) <br />Cost Breakdown: <br />Average Maneuver Time: <br />0.25 <br />feet <br />Productionp er unit area: <br />Utilization % <br />Ownership Cost/Hour: <br />$220.12 <br />NA <br />Operating Cost/Hour: <br />$235.69 <br />100 <br />Ripper Ownership Cost/Hour: <br />$21.79 <br />NA <br />Ripper Operating Cost/Hour: <br />$11.30 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total Unit Cost/Hour: <br />$530.75 <br />Net Correction: <br />Total Fleet Cost/Hour: $1,061.49 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA <br />Area: 18.90 acres <br />Selected estimating method: Area <br />Bank Volume: NA BCY NA <br />Rip Depth (ft): 1.50 Volume: 45,738 NY orCCY <br />Source ofestimatedquantity: Table 7 Exh. 13B -T-20 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />AverageRipping Depth: <br />3.00 <br />mph <br />Average Ripping Width: <br />7.94 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Productionp er unit area: <br />0.897 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.897 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.74 <br />Acres/hr <br />AdjustedHourly Fleet Production: <br />1.49 <br />Acres/hr <br />JOB TIME AND COST <br />
The URL can be used to link to this page
Your browser does not support the video tag.