My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-26_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 8:42:37 AM
Creation date
3/27/2018 7:31:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/26/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR118
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total Cost <br />Subtotal (adjusted for <br />Job Hours: 60.00 (unadjusted): $263,178.02 location): $251,335.01 <br />in. thick- No <br />reinforcing <br />WaterTank <br />35' dia <br />Bldg. (MN) <br />279,941.00 <br />CF <br />$0.21 <br />$59,067.55 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />ANFO Silo #1 <br />10' diax 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />ANFO Silo #2 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />ANFO Silo #3 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Electrical <br />80' x 80' x <br />Bldg. (SN) <br />76,800.00 <br />CF <br />$0.19 <br />$14,208.00 <br />Substation <br />12' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Communications <br />20' x 20' x <br />Bldg. (SN) <br />4,800.00 <br />CF <br />$0.19 <br />$888.00 <br />Building <br />12' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Remove Taylor <br />150' <br />Pipe, steel, welded <br />150.00 <br />LF <br />$6.56 <br />$984.00 <br />Creek Elevated <br />connections -10 in. <br />Pipe <br />diameterpipe <br />Remove Elevated <br />1.5' x 2' <br />Footing, concrete, <br />16.00 <br />LF <br />$3.54 <br />$56.64 <br />Pipe Footers <br />average reinforcing <br />-1.5ft. x2ft, <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 60.00 (unadjusted): $263,178.02 location): $251,335.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.