Laserfiche WebLink
16) Please provide an estimate of the actual costs to reclaim the site based on what it would <br />cost the State of Colorado using an independent contractor to complete reclamation. The <br />Office adds up to an additional maximum eighteen and one half (18.5%) percent of that <br />total, which includes a private contract, typical overhead costs and profit. <br />Direct Cost: <br />i. Backfilling: SO (cubic yards) X $ /a (cost per yard) = Totai $ 500 <br />ii. Grading: SO (cubic yards) X $ /O (cost per yard) = Total $ 000 <br />iii. Topsoil: (cubic yards) X $ 20 (cost per yard) = Total $ 200 <br />iv. Seeding: y (acres) X $ /00 (cost per acre) = Total $ Oa <br />v. Mobilization: �� (Pieces of equipment) X $ 300 (cost per equipment) - <br />Total $ SSD O <br />Direct Cost Subtotal: $ 2 ID o <br />Division's total overhead cost: X 18.5% <br />Division's Total cost: $ jurg' SO <br />Note: Based on the Division's experience the required financial warranty is normally set at <br />approximately $2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br />warranty in the amount of $12,500. <br />286455 12/13/2017 02:57 PM 6: 943 P: 305 LOC CT <br />Page 15 of 25 R $133.25 0 $0.00 T $133.25 CIear Creek <br />11115%11MATPIPRIINRhtk11111 <br />