Laserfiche WebLink
286455 12/13/2017 02;57 Piz B; 943 P: 304 LOC CT <br />Page 14 of 25 R $133.25 0 $0.00 T $133.25 CIear Creek <br />Illi U IWC VNITAKNION 11111 <br />EXHIBIT C - Mining Plan <br />Rule 6.3.3 (Starts on Page 136 of the Rules) <br />The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br />operation. The plan must be correlated to Exhibit E — Map. <br />1) Estimated dates of commencement: S 11 h / 7 and completion: & <br />2) How many years is the mine anticipated to be operational: I years <br />3) Will mining activities occur all -yearlong or just seasonally when weather permits (check one): <br />(ED all -yearlong or `M seasonally, explain; <br />4) How many aces of the mine site will be disturbed at any given time: acres <br />5) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br />4-6 inches 6-8 inches <br />8-10 inches I0-12 inches <br />Other: <br />N/A, explain: <br />6) Will you need to move any overburden (check one): Cn Yes or (0J No <br />a. If yes, approximately how thick is the overburden? 210 feet <br />7) How will the mine be accessed: d2 f) existing roads (E) new roads will be created <br />Please describe he existing r�cq d f <br />rs�+� N�larlct� �ort�F S�r►Jtct ��s <br />a. If there will be new roads or road improvements, please describe the new roads and road <br />improvements: <br />Nom► <br />9) Will water be needed during the mining operation (check one): (,n} Yes or (-[X1 No <br />a' If yes, Please describe the source of the water and how much water will be used during the <br />operation: <br />....... -----.-.. . <br />9) Will any water diversions or impoundments be constructed (check one): Cf:[) Yes or (]Z) No <br />a. If yes, please describe the water diversions or impoundments: <br />10) Will any chemicals be used during the mining process (check one): CO) Yes or CZ No <br />a. If yes, please describe the chemical types and quantities to be utilized, chemical storage and <br />spill containment and emergency response plans for on-site spills. Plant operation details <br />should include tank capacities and operating solution volumes: <br />