Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 74 of 143 <br />CIRCES Cost Estimating Software <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />Return portal <br />15x20x10 <br />Bldg. (SN) <br />3,000.00 <br />CF <br />$0.20 <br />$600.00 <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />return portal footers <br />1x2 <br />Demo. and on- <br />30.00 <br />LF <br />$3.91 <br />$117.30 <br />site disposal in <br />excavated pit, <br />1.5 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />Belt portal pump <br />20x14x10 <br />Bldg. (SC) <br />2,800.00 <br />CF <br />$0.25 <br />$708.40 <br />house <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />belt portal pump house <br />20x14 <br />Demo. and on- <br />280.00 <br />SF <br />$1.09 <br />$304.08 <br />slab <br />site disposal in <br />excavated pit, <br />10 in. thick - <br />Max. 200 ft. <br />push <br />belt portal pump house <br />2x1 <br />Demo. and on- <br />68.00 <br />LF <br />$2.61 <br />$177.48 <br />footer <br />site disposal in <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />Electrical substation <br />19xl4x10 <br />Bldg. (SN) <br />2,660.00 <br />CF <br />$0.20 <br />$532.00 <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />electircal substation <br />19x14 <br />Demo. and on- <br />266.00 <br />SF <br />$0.65 <br />$173.43 <br />slab <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Electrical substation <br />3505 <br />Demo. and on- <br />1,225.00 <br />SF <br />$0.65 <br />$798.70 <br />slabs <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Main dumpster pad <br />20x8 <br />Demo. and on- <br />160.00 <br />SF <br />$0.65 <br />$104.32 <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Slope conveyor (box <br />8x8 <br />OBSOLETE- <br />240.00 <br />LF <br />$44.51 <br />$10,682.16 <br />truss section) <br />Conveyor, <br />elevated, <br />including <br />CIRCES Cost Estimating Software <br />