Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 73 of 143 <br />offices/warehouse/bath <br />150x60 <br />Demo. and on- <br />9,000.00 <br />SF <br />$0.65 <br />$5,868.00 <br />house slab <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />offices/warehouse/bath <br />1x4 <br />Demo. and on- <br />420.00 <br />LF <br />$5.86 <br />$2,461.20 <br />house footers <br />site disposal in <br />excavated pit, <br />1.5 ft. x 3 ft. - <br />Max. 200 ft. <br />push <br />Covered storage <br />80x2Oxl8.5 <br />Bldg. (SN) <br />29,600.00 <br />CF <br />$0.20 <br />$5,920.00 <br />building <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />storage building slab <br />80x26 <br />Demo. and on- <br />2,080.00 <br />SF <br />$0.65 <br />$1,356.16 <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />storage building <br />1x4 <br />Demo. and on- <br />260.00 <br />LF <br />$5.86 <br />$1,523.60 <br />footers <br />site disposal in <br />excavated pit, <br />1.5 ft. x 3 ft. - <br />Max. 200 ft. <br />push <br />Main septic system <br />4000 gal <br />Excavate and <br />1.00 <br />EA <br />$571.50 <br />$571.50 <br />tank <br />load tank onto <br />trailer, non - <br />leaking - 3,000 <br />gal. to 5,000 <br />gal. <br />Fuel storage building <br />45x25x20 <br />Bldg. (SN) <br />22,500.00 <br />CF <br />$0.20 <br />$4,500.00 <br />and apron <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />fuel storage building <br />45x27 <br />Demo. and on- <br />1,215.00 <br />SF <br />$0.87 <br />$1,055.84 <br />slab <br />site disposal in <br />excavated pit, 8 <br />in. thick - Max. <br />200 ft. push <br />fuel storage building <br />1x4 <br />Demo. and on- <br />140.00 <br />LF <br />$5.86 <br />$820.40 <br />footers <br />site disposal in <br />excavated pit, <br />1.5 ft. x 3 ft. - <br />Max. 200 ft. <br />push <br />Belt portal <br />15x20x10 <br />Bldg. (SN) <br />3,000.00 <br />CF <br />$0.20 <br />$600.00 <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />belt portal footers <br />1x2 <br />Demo. and on- <br />30.00 <br />LF <br />$2.61 <br />$78.30 <br />site disposal in <br />CIRCES Cost Estimating Software <br />