My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-08_PERMIT FILE - C1981035A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2018-03-08_PERMIT FILE - C1981035A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 9:42:40 AM
Creation date
3/22/2018 11:22:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/8/2018
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 69 of 143 <br />SAFEGUARDING UNDERGROUND OPENINGS <br />Task description: Seal Mine Openings <br />Site: King Coal Mine Permit Action: RN7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task <br />100 State: Colorado <br />Quantity <br />uantit <br />Unit <br />Date: <br />5/5/2017 County: La Plata <br />User: <br />JHB <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: C035-100 <br />Opening <br />Description <br />Dimensions <br />Closure Method <br />Quantity <br />uantit <br />Unit <br />Unit <br />Cost <br />Total Cost <br />Portal 1 seal <br />200 <br />Adit closure - <br />200.00 <br />SF <br />$105.56 <br />$21,112.00 <br />bulkhead seal, >= 36 <br />sq. ft. (per sq. ft.) <br />Portal 1 drain pipe <br />165 <br />PVC drain pipe, 6 in. <br />165.00 <br />LF <br />$9.56 <br />$1,577.40 <br />diameter (per In. ft. <br />incl. mat. & labor) <br />Portal 1 backfill <br />185 <br />Adit closure - <br />185.00 <br />CY <br />$27.00 <br />$4,995.00 <br />backfilling (per cu. <br />d.) <br />Portal 2 seal <br />200 <br />Adit closure - <br />200.00 <br />SF <br />$105.56 <br />$21,112.00 <br />bulkhead seal, >= 36 <br />sq. ft. (per sq. ft.) <br />Portal 2 drain pipe <br />165 <br />PVC drainpipe, 6 in. <br />165.00 <br />LF <br />$9.56 <br />$1,577.40 <br />diameter (per In. ft. <br />incl. mat. & labor <br />Portal 2 backfill <br />185 <br />Adit closure - <br />185.00 <br />CY <br />$27.00 <br />$4,995.00 <br />backfilling (per cu. <br />d.) <br />Portal 3 seal <br />200 <br />Adit closure - <br />200.00 <br />SF <br />$105.56 <br />$21,112.00 <br />bulkhead seal, >= 36 <br />sq. ft.(per sq. ft.) <br />Portal 3 drain pipe <br />165 <br />PVC drainpipe, 6 in. <br />165.00 <br />LF <br />$9.56 <br />$1,577.40 <br />diameter (per In. ft. <br />incl. mat. & labor) <br />Portal 3 backfill <br />185 <br />Adit closure - <br />185.00 <br />CY <br />$27.00 <br />$4,995.00 <br />backfilling (per cu. <br />d.) <br />Portal 4 seal <br />200 <br />Adit closure - <br />200.00 <br />SF <br />$105.56 <br />$21,112.00 <br />bulkhead seal, >= 36 <br />sq. ft.(per sq. ft.) <br />Portal 4 drain pipe <br />165 <br />PVC drainpipe, 6 in. <br />165.00 <br />LF <br />$9.56 <br />$1,577.40 <br />diameter (per In. ft. <br />incl. mat. & labor) <br />Portal 4 backfill <br />185 <br />Adit closure - <br />185.00 <br />CY <br />$27.00 <br />$4,995.00 <br />backfilling (per cu. <br />d. <br />Job Hours: 32.00 <br />Total Cost: $110,737.60 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.