Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 68 of 143 <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />Haul Route: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity Travel <br />Velocity <br />(Ft) <br />Loading Tool unit <br />(%) <br />(%) <br />(fpm) Time <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />10560.00 <br />11.50 <br />5.00 <br />16.50 <br />690 15.314 <br />Haul Time: 15.314 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />42.00 <br />LCY/Hour Adjusted for job efficiency: <br />34.86 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />1 <br />10560.00 <br />-11.50 <br />5.00 <br />-6.50 <br />2938 <br />3.705 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 3.705 <br />minutes <br />Total Truck Cycle Time: 21.727 <br />minutes <br />Loading Tool unit <br />Production <br />504.90 <br />LCY/Hour Adjusted for job efficiency: <br />419.06 LCY/Hour <br />Truck Unit Production <br />42.00 <br />LCY/Hour Adjusted for job efficiency: <br />34.86 LCY/Hour <br />Optimal No. of Trucks: <br />12 <br />Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 209.18 <br />LCY/Hour <br />Adjusted single truck/loader team production: 209.18 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 209.18 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 30.85 <br />Hours <br />Unit cost: <br />$3.671 <br />/LCY Total job cost: $23,690 <br />CIRCES Cost Estimating Software <br />