Laserfiche WebLink
TAB 1 <br />HAYDEN GULCH LOADOUT <br />PERMIT SUMMARY <br />Introduction <br />On September 28, 1992, Hayden Gulch Terminal, Inc. (HGTI), a subsidiary of Peabody Energy <br />Corporation (Peabody), entered into an Asset Purchase Agreement with H -G Coal Company <br />and Axial Basin Ranch Company to purchase, among other assets, a coal loading facility, the <br />"Hayden Gulch Loadout", which is located in Routt County, Colorado, approximately 1.5 <br />miles southeast of the Town of Hayden, Colorado. <br />This coal loading facility was originally included in H -G Coal Company's permit application <br />package for the Hayden Gulch Mine, a surface coal mine permitted under Mining and <br />Reclamation Permit No. C-80-003 by the Colorado Mined Land Reclamation Division (a <br />precursor to the Colorado Division of Reclamation, Mining and Safety [CDRMS]) on January 4, <br />1982. The permit was renewed by H -G Coal Company on two occasions: January 4, 1987 and <br />January 4, 1992. <br />Permit No. C-80-003 (as originally approved in 1982) included geographically distinct permit <br />areas covering the coal loadout and the surface mine. The loadout facility area, located seven <br />miles northeast of the mine site, as originally permitted contained 134 permitted acres of <br />which 54 were reported to be disturbed. In 1986, coal production ceased and final reclamation <br />operations commenced at the surface mine. Concurrently, operations ceased at the loadout, <br />although it was not reclaimed by H -G Coal Company in anticipation of future development of <br />coalreserves it held in the area of the Hayden Gulch Mine. <br />The closing between HGTI and H -G Coal Company and Axial Basin Ranch Company under the <br />Asset Purchase Agreement was contingent upon certain conditions. These conditions included <br />the transfer of issuance, as appropriate, of permits needed to operate the loadout facility without <br />any material adverse change in the permit conditions, requirements, or limitations (or reasonably <br />satisfactory evidence is received by Hayden Gulch Terminal, Inc., that such transfers or <br />issuances will be approved by the appropriate regulatory authority). <br />The September 1992 Asset Purchase Agreement did not include the mine site. Consequently, <br />transfer of Permit No. C-80-003 was inappropriate, and Hayden Gulch Terminal, Inc. submitted a <br />new application (dated December 14, 1992) to operate the coal loading facility pursuant to the <br />Regulations of the Colorado Mined Land Reclamation Board for Coal Mining. <br />In 2010, the operating entity was changes to a limited liability company, and HGTI became Hayden <br />Gulch Terminal, LLC (HGT). <br />RN17-05 1-2 Revised 11/17 <br />