Laserfiche WebLink
Truck/LoaderWorksheet Cont'd Task# 004 Page of <br />Truck Travel (Haul & Return) Time: <br />nenetration 5.0 <br />HaulRoute: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res Total Res <br />Velocity <br />Travel <br />Truck Unit Production <br />(Ft) <br />(%) <br />(%) (%) <br />(fpm) <br />Time <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 762.99 <br />min <br />1 <br />400.00 <br />19.00 <br />5.00 24.00 <br />338 <br />1.187 <br />HaulTime: 1.187 minutes <br />Return Route: <br />Seg # <br />HaulDistance Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Truck Unit Production <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 762.99 <br />mm <br />1 <br />400.00 -19.00 <br />5.00 <br />-14.00 <br />1377 <br />0.403 <br />Return Time: 0.403 minutes <br />Total Track Cycle Time: 5.140 minutes <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />459.63 LCY/Hour Adjusted forjob efficiency: <br />381.49 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 762.99 <br />LCY/Hour <br />Adjustedsingle truck/loader teamproduction: 762.99 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 762.99 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Totaljobtime: <br />13.00 Hours <br />Unitcost: $1.692 /LCY Totaljobcost: $16,788 <br />CIRCES Cost Estimating So$ware <br />