My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-21_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-03-21_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2018 10:53:19 AM
Creation date
3/21/2018 10:35:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/21/2018
Doc Name
Adequacy Review Response #2
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
RN7
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX: (970) 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />March 16, 2018 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Clayton Wein <br />Division of Reclamation, Mining & Safety RECEIVED <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 MAR 212018 <br />Re: Bowie Resources, LLC, Bowie No. 1 Mine Division of Reciamation, <br />Permit Renewal Adequacy #2 Mining & Safety <br />Permit C-1981-038 <br />Dear Mr. Wein: <br />The DMRS' letter dated March 6, 2018 transmitted its second adequacy review for the Bowie <br />No. 1 Mine's permit renewal. On behalf of Bowie Resources LLC, following are its responses to <br />the DRMS' comments and concerns. <br />Rule 2.05.4 - Reclamation Plan: <br />7. DRMS - The reclamation plan in Volume 7, for the Paonia Loadout, requires additional <br />information relating to the sequence of reclamation activities to occur at the site. <br />Please provide a narrative in section 2.05.4 detailing the process of reclamation <br />activities to achieve the post mining land use of cropland. Include the sequence of <br />events involving the reclamation of the structures, pads, roads and ponds that will be <br />removed prior to backfilling and grading. Please include details about if demolished <br />materials will be removed from the site and if concrete pads will be crushed and <br />buried or left in place and buried. <br />BRL— Please see amended pages 2.05-23 through 2.05-25. <br />10. DRMS - The Division received a letter from Steven K. Harper on November 29, 2017 <br />regarding the Farmers ditch culvert, the email was forwarded to BRL on January 10, <br />2018. In the email from Mr. Harper, he stated; "The Company's position was that they <br />did not consent to a perpetual culvert in their ditch; their consent in 1977 was only for <br />the period consistent with mining activity.. . " How will the culvert be able to remain in <br />place as stated on p. 2.05-14? Please include a narrative in section 2.05.4 detailing <br />how the area around arfd on top of the Farmers Ditch Culvert will be backfilled and <br />graded if the statement on p. 2.05-14 is correct. <br />
The URL can be used to link to this page
Your browser does not support the video tag.