Laserfiche WebLink
u' ;n <br /> 0W.W. <br /> Transit Mix Concrete Co. <br /> Response: The revegetation summary in Exhibit L has been updated. The seed mixes match <br /> those listed in the tables found in Exhibit E. The seed mixes (stems/acre mix) has been included <br /> at the bottom of the revegetation summary calculations. <br /> 12) The applicant's response to Item No. 58 of the Preliminary Adequacy Review states that <br /> Exhibit E has been revised to include a table listing the acreage associated with each revegetation <br /> type, and that revegetation types with multiple species, lists based on water availability, also <br /> have the acreage specific to each species list. However, Table E-2, Reclamation Areas by <br /> Planting Type, includes 0 acres for Wet Shrubland and 0 acres for Dry Riparian. Please provide <br /> an estimated acreage for all revegetation type mixtures. Additionally, the acreages accorded to <br /> each revegetation type in Table E-2 do not correlate with those given in Exhibit L, revegetation <br /> summary. For example, Table E-2 shows that 81.14 acres will be revegetated to Mixed Conifer, <br /> while Exhibit L shows that 57.97 acres will be revegetated to Mixed Conifer. The values are <br /> inconsistent for all revegetation types. Also, according to Table E-2, a total of 195.82 acres will <br /> be revegetated, while Exhibit L costs account for revegetating a total of 139.51 acres. This is a <br /> difference of 56.31 acres. Please make the necessary corrections to Table E-2 and/or Exhibit L to <br /> eliminate these contradictions. <br /> Response: Table E-2 has been revised to estimate the acreages for the Wet Shrubland and Dry <br /> Riparian planting areas and to include revegetation of the "Mining Related Area"(which is not <br /> planned for disturbance). The reclamation areas equal 239.03 acres. <br /> Transit Mix has provided the reclamation bond estimate for mining through Phase 3, and Transit <br /> Mix commits to updating the reclamation bond calculations prior to starting Phase 4. The <br /> disturbance through Phase 3 is limited to 159.92 acres; therefore, the reclamation costs have been <br /> calculated using this area. The conditions at the end of Phase 3 are different from those at the <br /> end of the quarry operation(Phase 6) and the total reclamation area and the acreages associated <br /> with each revegetation type will also be different. <br /> EXHIBIT G -Water Information (Rule 6.4.7) <br /> 13) The applicant's response to Item No. 66 of the Preliminary Adequacy Review states the <br /> operation will require an average of 4-6 truckloads per day using a 6,000-7,000 gallon tanker <br /> truck. If the quarry were to operate 365 days/year, that would give a maximum of 15.33 million <br /> gallons/year(42,000 gallons/day x 365 days). Is this value correct for mining phases of the <br /> project? Please provide an estimate of the project water requirements including annual volumes <br /> for the development, mining, and reclamation phases of the project. <br /> Response: The volumes estimated are for the operational phase. Transit Mix anticipates that <br /> less water will be required for development and reclamation than for operations. Water <br /> requirements for development are estimated to be approximately 4,300,000 gallons per year(1-2 <br /> truckloads per day). Water requirements for site reclamation are estimated to be 2,200,000 <br /> gallons per year(1-2 truckloads per day). Once the slopes are regraded and seeded/planting, no <br /> long-term watering is expected to be required. <br /> Hitch Rack Ranch Quarry(M-2017-049) <br /> Response to Comments—March 20,2018 <br />