My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-20_PERMIT FILE - M2017049 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2018-03-20_PERMIT FILE - M2017049 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2021 3:43:28 AM
Creation date
3/20/2018 12:46:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
PERMIT FILE
Doc Date
3/20/2018
Doc Name
Adequacy Review Response #2
From
Transit Mix Concrete
To
DRMS
Email Name
TC1
WHE
ERR
ECS
PSH
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transit Mix Concrete Co. <br /> Seedbed preparation, timing of the seeding, and erosion control is vital to assure successful <br /> reclamation. The soil must provide moisture, nutrients, shelter and shade for plant establishment <br /> and growth (Brown & Hallwell, 1984). <br /> Seedbed conditioning provides important benefits for plant germination, establishment, and long- <br /> term vitality. Seedbed conditioning can loosen compacted soils, provide catchments to increase <br /> water available to plants and create microsites that shelter seeds and seedlings, and remove <br /> competing soils (Brown & Hallman, 1984). Prior to reseeding efforts, any compacted soils will be <br /> alleviated through scarification using specific necessary equipment in order to increase infiltration. <br /> As detailed in Exhibit I, soil sampling conducted within the pit indicates that topsoil has the <br /> nutrients necessary to provide adequate growth media material. As such, Transit Mix does not <br /> anticipate that soil amendments will be necessary during reclamation. However, as <br /> recommended by WHC, Transit Mix will test topsoil stockpiles prior to use to confirm that <br /> precipitation and interim vegetation have not depleted nutrients, and fertilizers and soil <br /> amendments will be added if necessary. Transit Mix does not anticipate using any fertilizers or <br /> soil amendments. Forestry and wildlife habitat land uses do not require the repeated fertilizer <br /> applications that would be required by an agricultural land use (Vogel, 1987). <br /> Timing of seeding will be key to the success of the reclamation effort. Native grasses will be <br /> seeded and allowed to be established prior the tree planting. Seeding will occur at an appropriate <br /> time for successful germination, likely in early fall to promote over-winter germination of hardy <br /> cool-season native grasses. Tree planting will also occur in the late fall when soil moisture is <br /> optimal. <br /> Bare-root stock will be protected from exposure to sun, heat, and drying during shipment and <br /> delivery to the site (Vogel, 1987). Seedlings will be planted as soon as possible after delivery. If <br /> necessary, to keep stock several days before planting, bundles will be moistened and stored in a <br /> cool, shaded place (Vogel, 1987). Site preparation prior to tree planting will include clearing an <br /> area roughly 3 feet by 3 feet, and preparing a depression surrounded by an earthen berm. Prior <br /> to planting, bare root seedlings will be dipped in a mycorrhizal solution or inoculant. Tree <br /> seedlings will be planted in the center of the basin, and an anchored weed control fabric installed. <br /> A mesh tree guard will be placed around the seedling to reduce loss from foraging species. The <br /> planting of tree seedlings on the benches will not be supported by irrigation systems, and therefore <br /> planting will be followed by an initial watering to enhance success. <br /> One of the primary goals in successful reclamation is erosion control. Transit Mix will employ a <br /> variety of methods to reduce erosion and to promote successful revegetation. Gouging and minor <br /> undulations in the topography not only reduce erosion and but also provide some visual barriers <br /> for wildlife escape and increase interspersion and edge effect (Parish & Anderson, 1994). <br /> Gouging and micro undulations creates microbasins by using a backhoe or hydraulic excavator. <br /> The hydraulic excavator is used to dig, poke, or push basins with a minimum depth or elevation <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 20,2018 E-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.