- ` ; <br /> Transit Mix Concrete Co. <br /> Table D-6 <br /> Affected Lands Associated with Mining Phases <br /> Affected Total Reclaimed Affected <br /> Phase Lands Area Affected Land Lands By <br /> (acres) Lands Area (acres) Phase <br /> (acres) (acres) <br /> Phase 1 88.47 88.47 20.57 67.90 <br /> Phase 11 22.13 110.6 3.97 86.06 <br /> Phase III 46.33 156.93 18.54 113.85 <br /> Phase IV 34.26 191.19 2.77 145.34 <br /> Phase V 47.85 239.03 1 28.68 1 164.50 <br /> Phase VI 0 239.03 164.50 0 <br /> Total 1 239.03 239.03 239.03 0 <br /> (e) Timetables for Mining and Reclamation Operations <br /> The estimated time required for each phase of this Plan is shown in Table D-7 below. The mining <br /> procedures used in Phases I - V will be consistent with those described above in the Mining <br /> Method and Earthmoving section of this Application. Phase VI will include the removal of all <br /> facilities. The reclamation schedule will be expedited as the mining operation permits. <br /> Reclamation activities will start as soon as the access road is completed, and for the pit area, <br /> reclamation activities will start once mining begins in Phase II as shown in Figure C-5. Prior to <br /> beginning reclamation, the affected lands boundary will be GPS surveyed and staked to delineate <br /> the work area. This process will ensure the protection of areas located outside the affected land <br /> boundary from damage. Reclamation and mining will progress contemporaneously in accordance <br /> with the reclamation plan described in Exhibit E. <br /> The reclamation of mining areas will begin during Phase II, as shown in Figure C-5. This allows <br /> for direct haulage and placement of overburden/fines as a component of the re-grading / <br /> reclamation of these areas. The lower portion (below elevation 7,250) of F1 fines and overburden <br /> storage area will be regraded and reclaimed during Phase III, after this area achieves its full <br /> capacity as shown in Figure C-6. The fines and overburden will be placed as backfill in areas F2 <br /> and F3, beginning with F2 as illustrated in Figure C-6 then the F3 backfill area in the horseshoe <br /> area. When F2 and F3 reach their designed capacities, these areas will be regraded and <br /> reclaimed during Phase VI as depicted in Figure C-9. After mining is finished, final reclamation <br /> will be completed as shown in Figure F-1. Table D-7 summarizes the mining and reclamation <br /> schedules of all development phases. The mining schedule is based upon annual production of <br /> 1.5 to 2 million tons per year. The development mining schedule may accelerate if maximum <br /> volumes are attained earlier. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 20,2018 D-17 <br />