Laserfiche WebLink
p�CO <br /> M-2008-082 - TR05 T COLORADO DIVA D SAFETY <br /> * 1313 Sherman Stt Complied! <br /> NO Violations! <br /> ecs, whe <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER Sil-L-L r <br /> File No.: M- 2008-082 Site Name: Morton Lakes <br /> County Weld TR# (DRMS Use only1 <br /> Permittee: Ready Mixed Concrete Company (RMCC) ReeiEl <br /> Operator(If Other than Permittee): NO t� 4 <br /> Joe Lamanna _ <br /> Permittee Representative: DMSION oj:R=r•t ....-.__ <br /> MINING AND SAFETY <br /> Please provide a brief description of the proposed revision: <br /> RMCC wishes to revise the current Morton Lakes mining plan by temporally converting the use of Stage 6(B)from sand and gravel storage to a temporary 5 acre groundwater <br /> recharge pond to address the water levels in the A&W well.To do this,RMCC proposes to install a temporary earthen berm on the pit floor between stages 6(A)and 6(B). <br /> e current approved ma n for stages will remain unchanged,namely developed water storage. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />