Laserfiche WebLink
5. Silo Foundations: The north east silo and center silo foundations will be <br />lowered four feet. The concrete will be demolished and removed from <br />the site or buried in the coal stockpile area. This demolition is necessary <br />to provide four feet of cover over the concrete foundations. (2 weeks) <br />6. Foundations: The concrete foundations for the elevating conveyors and <br />the train loadout structure and other miscellaneous foundations will be <br />demolished. Most if not all of the demolished concrete will be buried in <br />the coal stockpile area. (1 week) <br />7. Shop Building: The shop building will be dismantled and removed from <br />site. The concrete foundation will be demolished and removed from the <br />site. (1week) <br />8. Train Loadout Substation: Transformers and fence will be removed <br />from site. (1 week) <br />9. 46 kV Powerline: This powerline extends from the metering point <br />located north of the Fire Mountain Canal to the loadout facility. The <br />power poles, cross arms, insulators, conductor and metering point will <br />be dismantled and removed from site. (2 weeks) <br />10. Powerline: This powerline extends from the loadout substation down to <br />the pump house located on property owned by Bradley Investments. <br />The power poles, transformers, cross arms, insulators and conductor will <br />be dismantled and removed from site. (1 week) <br />11. Regrade Site: The loadout site will be regraded to approximate original <br />contours as shown on Map 8A. Fill from the outslopes will be excavated <br />and placed on the cut slopes to establish design contours. The scale <br />road will be graded to approximate original contour. As part of this <br />activity the Farmers Ditch will be reestablished though the loadout as an <br />open ditch. The existing Farmers Ditch culvert will be removed and <br />disposed of off site. Excess material will be placed in the coal stockpile <br />area. Topsoil salvaged from the scale facility area will be replaced on <br />the regraded area. The regraded areas will be seeded and mulched. (2 <br />months) <br />RN -07 2.05-24 03/19/18 <br />