Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX: (970) 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />March 19, 2018 <br />Clayton Wein <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 1 Mine <br />Permit Renewal Adequacy #3 <br />Permit C-1981-038 <br />Dear Mr. Wein: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DMRS' letter dated March 19, 2018 transmitted its third adequacy review for the Bowie No. 1 <br />Mine's permit renewal. On behalf of Bowie Resources LLC, following are its responses to the DRMS' <br />comments and concerns. <br />Rule 2.05.4 - Reclamation Plan: <br />14. DRMS — Item 9 of the Reclamation Plan. The text references a metering point located to the <br />north of the Fire Mountain Canal, the Division assumes that this is the metering point along <br />Stevens Gulch. The text is unclear if this metering point will be included in the reclamation of <br />the power poles, cross arms, insulators and conductor. Please include text verifying that the <br />metering point will be included along with these activities. <br />BRL—The metering point will be removed from site. See amended page 2-05-24. <br />Rule 2.05.5 - Post Mining Land Uses <br />11. DRMS - Page 2.05-33, first paragraph, last sentence. "It is unclear how these regulations <br />would impact the County's approval of post mining land uses." Please remove this sentence <br />from the paragraph. The text in the paragraph will adequately address the Division's <br />adequacy item no. 11 without the need for the sentence mentioned above. <br />BRL—The referenced sentence was removed. See revised page 2.05-33 is enclosed. <br />Sincerely, <br />J. E. Stover <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Paonia Public Library, OSM, BLM and Basil Bear Electronic <br />