Laserfiche WebLink
March 16, 2018 <br />Tony Tennyson <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Coal Nline (Permit No. C-1981-019) <br />Technical Revision No. 119 (TR -119) <br />Adequacy Review <br />Dear Mr. Tennyson: <br />After reviewing TR -119 from Colowyo Coal Company L.P. (Colowyo), the Division has the following <br />comments: <br />1. On proposed Volume 1, Rule 4, page 2, in the first paragraph under Section 4.03.1 it states that the <br />main Haul Road A for Colowyo operation is shown on Maps 21 and 25F. However, Map 25F is <br />approved as Collom Haul Road — Elevated Crossing and appears it should be referenced to proposed <br />Map 25G. Please update Volume 1, Rule 4, page 2 with the correct reference. <br />2. The Division has performed a reclamation cost estimate to reclaim the disturbances associated with <br />the Haul Road A widening. The total value of this estimate is $406,462.07 (see attachedc ost estimate). <br />The Division's cost estimate is consistent with previous cost estimates approved by both the Division <br />and Colowyo. The Division respectfully requests a response from Colowyo with any questions <br />regarding the cost estimate or an acceptance of the Division's estimate. <br />If you have any questions, feel free to contact me at any time. <br />Sincerely, <br />Zach Trujillo <br />Environmental Protection Specialist <br />(303) 866-3567 ext. 8164 <br />Zach.Trujillo@state.co.us <br />