Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 4 of40 <br />DEMOLITION WORK <br />Task description: Demo Collom Facilities Additions <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Permit Action: TRI 18 <br />Task 002 State: Colorado <br />Date: 3/14/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />UNIT COSTS <br />95.50% <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-002 <br />Location adjustment: <br />Structure or <br />Item Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cos t <br />Demo Concrete <br />110'x 100'x <br />Pavement, concrete, <br />764.00 <br />CY <br />$91.00 <br />$69,524.00 <br />Pad # 1 <br />1.875' <br />demolition only, 7 <br />in. to 24 in. thick - <br />No reinforcing <br />Demo Concrete <br />10'x 32'x <br />Pavement, concrete, <br />223.00 <br />CY <br />$91.00 <br />$20,293.00 <br />Pad #2 <br />1.875' <br />demolition only, 7 <br />in. to 24 in. thick - <br />No reinforcing <br />Communications <br />20' x 20' x <br />Bldg. (SN) <br />4,800.00 <br />CF <br />$0.19 <br />$888.00 <br />Building <br />12' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 60.00 (unadjusted): $90,705.00 location): $86,623.28 <br />CIRCES Cost Estimating So$ware <br />