My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-19_REVISION - M2007087
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007087
>
2018-03-19_REVISION - M2007087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:16 PM
Creation date
3/19/2018 4:01:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007087
IBM Index Class Name
REVISION
Doc Date
3/19/2018
Doc Name
Request for Technical Revision
From
Albert Frei & Sons, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
JLE
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> opco�o <br /> * COLORADO DIVISION OF RECLAMATION_ Mnvnvr_ A XT <br /> " SAFETY <br /> * */876 1313 Sherman Stre <br /> -087- TR02 <br /> M-2007 <br /> REQUEST FOR Tl Complied! <br /> NO Violations! <br /> File No.: M- M-2007-087 Si jle, whe <br /> County Adams TRH_ (DBMS Use only <br /> Permittee:Albert Frei and Sons, Inc. 1111"INIVE19 <br /> Operator(If Other than Permittee): MAR 192018 <br /> Permittee Representative: Bernard Frei '$101V��(T,. <br /> Please provide a brief description of the proposed revision: <br /> The TR is to change final reclaimed configuration to as built with slopes 3:1 or flatter <br /> and backfilling setbacks from property line decreased to 5 feet or less per land owners <br /> request. Additional information and maps attached as part of this request. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until,the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time,in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.