Laserfiche WebLink
°LL <br /> 20' MIN. z� ofz�U.1 Cr pz~� Lr <br /> NwXin V)w m �' <br /> �w z=LU z=w 0 N° <br /> Q RECLAIMED SLOPE r ry Ofof X oN � <br /> o <br /> z HISTORIC GROUND O=o o�o I o F-o I -0 <br /> of ��z z Miz.2� <br /> TOP SOIL �Co MINING HIGHWALL a o o a w o o Q w o o NOTES: <br /> =cnm =amz =mmz <br /> -- ---- ___ - 1. The proposed final land use for the Harmony Gardens Site is (V <br /> `" - --------- ---------- - -- general agriculture. <br /> 3'-- <br /> � <br /> 4" TOP SOIL 2. Reclaimed mine pit side slopes will be created from backfill O <br /> 9'-15' 2" TOP SOIL with overburden. CV <br /> ���_ <br /> 3. All available topsoil and overburden material will be used for BOTTOM OF PIT GRADED TO DRAIN backfilling and site reclamation. Q< <br /> s. <br /> FINAL ELEVATIONS DEPEND ON MATERIAL AVAILABILITY z o <br /> 4. no slopes will be reclaimed any steeper than 3H:1 V. IX Q z <br /> OVERBURDEN ---- LLI o <br /> ,e ,<r 5. The growth medium for revegetation will be replacement of _ d � <br /> BACKFILL MATERIAL a z w <br /> MINING FLOOR pre-existing topsoils. _ <br /> 6. The seed mixture for the proposed permit.area provides a - _j <br /> native grass seed mix. O X O v <br /> LLI <br /> Revegetation Seed Mix U Q v <br /> TYPICAL RECLAIMED CROSS—SECTION A—A Rate Q w Uj <br /> N.T.S. Species (lbs PLS/acre) <br /> Blue Grama 5 Q <br /> W <br /> Western Wheatgrass 3 <br /> N Sideoats Grama 1 <br /> 20' MIN. z� pz�� pz�� _l <br /> w� ���� NofM TOTAL 9 <br /> Crw 0M:Uj Uj0 ZML'ip <br /> } Cr a- I �a^ Rates are for drill seeding. If broadcast seeding is <br /> Of z>- O r o O>-p used,double seeding rates. <br /> Q RECLAIMED SLOPE r ry W >_z of N r cn O N <br /> 0 <br /> z HISTORIC GROUND o=o o�o I O F-o I <br /> TOP SOIL w o :2�—z M�z-a M�z 7. Periodic inspection for noxious weeds,at least once a year <br /> m m MINING HIGHWALL Q o 0 Q w o o Q w o o early in the season,will be done as part of a weed management <br /> =cnm =amz =amz plan. W <br /> _ 8. The mine office/scale house trailer,portable processing W ~ Q <br /> - --------- -----�----------- facility,and an other structures associated with mining will U Q <br /> - tY> Y g <br /> 3 4" TOP SOIL be removed from the site during final reclamation activities. �' z O <br /> 9'-15' 1' 9. Best Management Practices will be used to control erosion and W J <br /> 2" TOP SOIL --------------- Q O <br /> - ---- stormwater suspended sediment runoff from the site during Q O <br /> BOTTOM OF PIT GRADED TO DRAIN W Q FINAL ELEVATIONS DEPEND ON MATERIAL AVAILAB reclamation activities. z <br /> ., 10. The mining limits follow the southern permit boundary to (� Z <br /> ILITY facilitate reclamation consistency with Existing Permit J } Z <br /> OVERBURDEN A ---- M-2017-056. W z O <br /> BACKFILL MATERIAL MINING FLOOR z 0 <br /> 0U Q <br /> LU <br /> ru � �� TYPICAL RECLAIMED CROSS—SECTION B—B <br /> N.T.S. <br /> MAR 15 2018 <br /> co 3 <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY N <br /> � M L <br /> LL <br /> W O g <br /> U) uj t <br /> Q � <br /> o , <br />