Laserfiche WebLink
' \� 2-TRACK <br /> di c� <br /> ' 1 E <br /> DIRT ACCESS <br /> I FARM ACCESS ROA ? <br /> i I I NORTH TO WELD 9� <br /> OUNTY ROAD 74) "� <br /> 60'TEMPORARY PERMIT I 'I 4-0 <br /> CONSTRUCTION BOUNDARY 1 — — ----- 200 0 200 Feet C) <br /> ' _ EASEMENT <br /> (D 2 <br /> Rec No.325837 { I SINCLAIR PIPELIN <br /> V A I 1 OMPANY (IN FEET) N <br /> V 1 inch 200ft. <br /> I A N <br /> PER IT BOUNDARY` A�♦ ERMIT: 3�1 �` 1 ' NOTES: <br /> PERMIT No.M-2017-05 s <br /> a _ <br /> \ 311 1 GARDEN 1. The proposed final land use for the Harmony Gardens Site is CV <br /> � general agriculture. <br /> Cry I TE PERMIT R M I T AREA EA 2. Reclaimed mine pit side slopes will be created from backfill O <br /> with overburden. N <br /> .90 ACRES <br /> Y '4' \`. 1 25'CITY OF GREELEY _ 3. All available topsoil and overburden material will be used for Q < <br /> WATER LINE EASEMENT backfilling and site reclamation. <br /> \ 2 o <br /> O 3 1 \1 Rec.No.3245837 4. no slopes will be reclaimed any steeper than 3H:IV. Z z <br /> ry <br /> Q 0 <br /> HERMIT 5. The growth medium for revegetation will be replacement of LLI LLI d — <br /> a 1 pre-existing topsoils. �= > <br /> BOUNDARY .-. Z W <br /> n I A WATER LINES -„ O O <br /> I I 6. The seed mixture for the proposed permit area provides a 't-- _ <br /> 1 \ (CITY OF GREELEY H Q <br /> \ t native grass seed mix. .� X Q U <br /> Revegetation Seed Mix U w Q v <br /> i Rate Q U i- <br /> BOTTO ( 31 Species a <br /> W <br /> I I (Ibs PLS/acre) IY <br /> TO DRAIN FINAL ELEVATIONS 4 1 1 A APPROXIMATE <br /> DEPEND ON MATERIAL �`:;. MINING LIMITS Blue Grama 5 Q <br /> AVAILABI. 0 1 LU <br /> t I I Western Wheatgrass 3 <br /> I I G GAS LINE 1 3 1 <br /> 'SINCLAIR PIPELINE 1 j 2-TRACK <br /> ACCESS Sideoats Grama 1 <br /> COMPANY) I \\ J <br /> TOTAL 9 <br /> 50' PIPELINE RIGHT-OF-WAY I , Rates are for drill seeding. If broadcast seeding is <br /> EASEMENT(BK 1641, PG 296) ' I ; , s 1 used,double seeding rates. <br /> PERMIT <br /> A t 1 ` BOUNDARY 7. Periodic inspection for noxious weeds,at least once a year <br /> 1 { early in the season,will be done as part of a weed management <br /> HARMONY WINDSOR 1 \ �� plan. W <br /> 8. The mine office/scale house trailer,portable processing � F— <br /> PERMIT BOUNDARY , !y p p g LLI <br /> facility,and any other structures associated with mining will � <br /> PERMIT No. M-2017-056 U <br /> �� �`�;�� be removed from the site during final reclamation activities. � Z O <br /> \ 9. Best Management Practices will be used to control erosion and O LLI JO i <br /> e \ stonnwater suspended sediment runoff from the site during U w <br /> 20' MIN. \ \�', �G reclamation activities. LLI Q } <br /> \ k <br /> > RECLAIMED SLOPE \ \ Xy 10. The mining limits follow the southern permit boundary to 0 Z <br /> \ i P i i h E i i l ili actate reclamation consistency with Permit � <br /> Q HISTORIC GROUND facilitate J � <br /> TOP SOIL — — 6 1 M-2017-056. LLI Z O <br /> Cr MINING HIGHWALL Z U <br /> Ujm aob LEGEND: Z o = <br /> -- - - ----------- O DRAIN FINAL ELEVATIONS' \ 0 Of W ` <br /> DEPEND ON MATERIAL ! \ ` <br /> _------ - \ s 1l ( 11 ----Permit Boundary <br /> 3 U = <br /> 4" TOP SOIL <br /> 9'-15' �1' — Mining Setback Line <br /> .» 2" TOP SOIL �\ APPROXIMATE <br /> Permit Buffer Line <br /> r r .. <br /> MINING LIMITS <br /> � \ 5 <br /> ———————— Existing Easement Line <br /> NOR COUND PERMIT c — Existing Gas Line <br /> OVERBURDEN BOUNDARY w— o <br /> DIVISION OF RECLAMATION BACKFILL MATERIAL MINING FLOOR --- Existing Water Line N N <br /> = Existing Dirt Access M <br /> MINING AND SAFETY <br /> A l 11 OR �\ 0 Overburden Stockpiles W u- 2 0 <br /> TYPICAL BACKFILL RECLAMATION PERMITBouNDARY �.� ' � i o w <br /> W w <br /> 10 <br /> N.T.S. Q a <br />