Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> February 2018 Monthly Report <br /> Page 2 <br /> Table 1-February 2018 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 2/28/18 0 <br /> M-6 2/28/18 Dry <br /> M-7 2/28/18 Dry <br /> M-8 2/28/18 Dry <br /> M-9 2/28/18 141.67 <br /> M-10 2/28/18 25.53 <br /> M-11 R 2/28/18 40.12 <br /> M-12 2/28/18 175.20 <br /> M-13R 2/28/18 126.11 <br /> M-14 2/28/18 130.98 <br /> M-15 2/28/18 92.08 <br /> M-16 2/28/18 23.59 <br /> M-19 2/28/18 23.60 <br /> M-21 2/28/18 17.38 <br /> M-22 2/28/18 16.13 <br /> M-26 2/28/18 15.13 <br /> M-32 2/28/18 46.96 <br /> M-33 2/28/18 57.08 <br /> M-34 2/28/18 23.67 <br /> BF-4 2/28/18 24.88 <br /> BF-6 2/28/18 30.88 <br /> LS-1R 2/28/18 Dry <br /> LS-2R 2/28/18 Dry <br /> LS-3 2/28/18 Dry <br /> LD-1R 2/28/18 Dry <br /> LD-2R 2/28/18 Dry <br /> LD-3 2/28/18 Dry <br /> Table 2—February 2018 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 2/28/18 Dry 72.46 0.00 <br /> P7 2/28/18 92.28 92.50 0.22 <br /> P8 2/28/18 96.53 97.51 0.98 <br /> P9 2/28/18 71.97 72.30 0.33 <br />