My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-13_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2018-03-13_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 7:49:52 AM
Creation date
3/13/2018 1:01:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
3/13/2018
Doc Name
Water Monitoring - Groundwater
From
Battle Mountain
To
DRMS
Annual Report Year
2018
Report Quarter_Month
Feb
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br /> March 6,2018 <br /> DIVISIONMAC 18 2018 <br /> 0'& <br /> M/N/NO4N 5��y/ON <br /> --�Mr. Lucas J.West <br /> State of Colorado <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street,Room 215 <br /> Denver, CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> February 2018 Monthly Report <br /> Dear Mr. Lucas: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br /> San Luis Project for the month of February 2018. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR-32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on February 28t', no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on February 28t`. The February tailing impoundment piezometer measurements <br /> identified these installations were either dry or contained less than 12 inches of water as illustrated in <br /> Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br /> monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR-32 <br /> QA/QC plan. <br /> The leak detection system was measured on February 28t'. A total of 870 gallons of water was excavated <br /> from the leak detection system yielding a monthly average of 30 gpad.The tailings pond under-drain <br /> measured 38 gpm. <br /> During the month of February,the West Pit water treatment plant operated efficiently discharging a total <br /> of 6,434,000 gallons(19.75 acre-feet)of water to Rito Seco Creek and a total of 375,800 gallons(1.22 <br /> acre-feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br /> Seco Creek remained dry during the month. <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 • (719)379-0798 • Fax(719)379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.