Laserfiche WebLink
�i <br />2.05.1 Objective. <br />No answer required. <br />2.05.2 Operation Plan - Estimated Area for Life of Operation. <br />Coal produced from the Bowie No. 2 Mine was previously trucked to the <br />loadout near Paonia. The loadout will handled up to 5 million tons per <br />year of coal produced from the Bowie No. 1 and No. 2 Mines and/or other <br />mines in the area. The coal was then loaded into unit trains and shipped <br />to its final destination, typically a mid -western coal tired power plant. No <br />additional disturbance is anticipated at the loadout. The loadout is <br />capable of handling the required coal throughput so no expansion should <br />was required. <br />RN -07 2.05-1 02/18 <br />