Laserfiche WebLink
0 - <br />(iii) The operator owns or has access to all the lands upon <br />which surface disturbance exists concerning the train <br />loadout and stockpile area. Delta County has no land <br />use codes and as such has no requirement for the <br />approval of post -mining uses. <br />The Black Bridge Road was realigned during the time the loadout facility was <br />constructed. This realignment significantly improved the use and safety of the road. <br />This road will not be returned to its premining configuration. See Map 8A. <br />(b) Not applicable. <br />(c) See Map 6 for Pre & Post -Mining land use information. <br />(d) Not applicable. <br />RN -07 <br />2.05-31 02/18 <br />