My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-09_PERMIT FILE - M2017049 (29)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2018-03-09_PERMIT FILE - M2017049 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 11:47:59 PM
Creation date
3/9/2018 3:38:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
PERMIT FILE
Doc Date
3/9/2018
Doc Name Note
PART 1 OF 3
Doc Name
Adequacy Review Response
From
Transit Mix Concrete Co.
To
DRMS
Permit Index Doc Type
Application Materials
Email Name
TC1
ERR
ECS
WHE
AME
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��}? <br /> , Transit Mix Concrete Co. <br /> Response: Transit Mix commits to collecting the mapping and drilling information and <br /> revising the geotechnical assessment with the site-specific information. Transit Mix will <br /> submit for Division review the data and results as a technical revision or amendment. <br /> 19. In 3.7.2 Faulting section of the geotechnical assessment, the Applicant states given the <br /> Phase 1 pit configuration (relatively shallow highwalls during initial mining of Phase 1), <br /> it is expected that adverse dips can be addressed by adjusting the mining sequence and <br /> direction. Please describe how the Applicant intends to adjust the mining sequence and <br /> direction to address the impacts of the faults on the highwall stability. <br /> Response: Adjusting the mining sequence addresses potential instabilities that can occur <br /> within the pit during the mining process. Faults or adverse structures can cause issues <br /> internal to the pit during the mining process which are often overlooked by only analyzing <br /> the final pit walls. The final wall design needs to, and this design does, account for adverse <br /> structures/faulting, but there can also be issues during mining within the pit that need to be <br /> addressed. The sequencing and direction of mining can be important in mitigating these <br /> risks during operations. <br /> 20. As recommended in Section 6.4 of the Hitch Rack Ranch Pit Wall Geotechnical <br /> Assessment, dated September 11, 2017, please commit to implementing water <br /> management procedures to divert surface runoff away from the pit walls. <br /> Response: Transit Mix commits to implementing and maintaining a water management <br /> system that minimizes runoff on the pit walls. <br /> 21. As recommended in Section 6.4 of the Hitch Rack Ranch Pit Wall Geotechnical <br /> Assessment, dated September 11, 2017, please commit to installing instrumented <br /> groundwater monitoring wells behind highwalls where natural topography continues <br /> above the pit crest. <br /> Response: Transit Mix commits to installing geotechnical monitoring instrumentation <br /> where the natural topography extends above the pit crest. <br /> 22. As recommended in Section 6.4 of the Hitch Rack Ranch Pit Wall Geotechnical <br /> Assessment, dated September 11, 2017, please commit to consequent investigations <br /> (mapping and drilling)to determine if adversely dipping low angle faults are present. <br /> Response: Transit Mix commits to collecting the mapping and drilling information and <br /> revising the geotechnical assessment with the site-specific information. Transit Mix will <br /> submit for Division review the data and results as a technical revision or amendment. <br /> 23. As recommended in Section 6.4 of the Hitch Rack Ranch Pit Wall Geotechnical <br /> Assessment, dated September 11, 2017, please commit to performing controlled blasting <br /> practices to minimize damage to the final quarry walls. <br /> Hitch Rack Ranch Quarry(M-2017-049) <br /> Response to Comments—March 9,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.