n <br /> o Transit Mix Concrete Co. <br /> Response: In general, no disturbance is planned for areas included in "Mining Related <br /> Area". This area includes the 50-foot buffer around all disturbance areas, which Transit <br /> Mix expects to leave undisturbed. This area also includes sediment detention basins along <br /> the access road and near fines stockpile F 1 as shown on the Exhibit G maps. To be extra <br /> conservative for the reclamation cost estimate, Transit Mix has assumed for this assessment <br /> that these areas have been disturbed. <br /> 85) On Page L-4, Table L-1, please explain why acreage for the Plant Area was differentiated <br /> from acreage for the Pit Floor/Stockpile Tops, as the plant area is located on the pit floor. <br /> Will these areas be reclaimed differently? <br /> Response: Plant area has been differentiated from the Pit Floor/Stockpile Tops as there <br /> will be additional activities occurring in this area; demolition of facilities, tearing/ripping <br /> up concrete, and removal other structures. Table L-1 has been revised to separate the Plant <br /> Area with the Pit Floor area. <br /> 86) On page L-4, Table L-1, please clarify which topsoil stockpiles are included in the 3.00 <br /> acres for Topsoil Stockpile. Does this acreage include TS 1, TS2, and TS4? Are the topsoil <br /> windrow areas adjacent to the access road included in the Topsoil Stockpile acreage or the <br /> Roads acreage? <br /> Response: The 3.00 acres of topsoil stockpiles in Table L-1 include the acreage for TS1, <br /> TS2, TS4. The topsoil windrow areas are included in the roads acreage. <br /> 87) On page L-4, Table L-1, please clarify which fines stockpiles are included in the 13.98 <br /> acres for Fines Stockpile. Does this acreage include F1, F2 and F3 fines/overburden <br /> backfill areas? Or does this acreage only include the F1 stockpile area, with acreages for F2 <br /> and F3 areas included in the Pit Floor/Stockpile Tops category? <br /> Response: The 13.98 acres only includes the F 1 stockpile area. The acreages for F2 and F3 <br /> areas are included in the Pit Floor/Stockpile Tops acreage. <br /> 88) On page L-4, Table L-1, please clarify which roads are included in the 37.22 acres for <br /> Roads. Does this acreage account for the access road and any roads in the quarry area that <br /> will be reclaimed? Will the haul road along the southern highwall shown on Figure C-6 be <br /> reclaimed? <br /> Response: The area for"Roads" in Table L-1 includes all disturbances associated with the <br /> access road, even those areas that will be reclaimed in Phase I. The 37.22 acres for Roads <br /> is for the access road, it does not include any highwall ramps, ramps leading to stockpiles, <br /> or in-pit ramps. These roads will be left in place and are included in the "Highwall Slope" <br /> or "Highwall Bench" areas. However, backfill material will be placed along the lower <br /> portion (refer to Figures F-1 and F-2) and the haul road will be reclaimed with Mixed <br /> Conifer(refer to Figure L-3). <br /> 89) On page L-4, Table L-1, the acreages given under each column do not add up to the total <br /> Hitch Rack Ranch Quarry(M-2017-049) <br /> Response to Comments—March 9,2018 <br />