My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-09_PERMIT FILE - M2017049 (29)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2018-03-09_PERMIT FILE - M2017049 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 11:47:59 PM
Creation date
3/9/2018 3:38:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
PERMIT FILE
Doc Date
3/9/2018
Doc Name Note
PART 1 OF 3
Doc Name
Adequacy Review Response
From
Transit Mix Concrete Co.
To
DRMS
Permit Index Doc Type
Application Materials
Email Name
TC1
ERR
ECS
WHE
AME
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transit Mix Concrete Co. <br /> Response: The Mountain Shrubland species mixture has been revised to more clearly show <br /> the species that will be planted depending on the varying levels of water available. <br /> 58) Please provide in Exhibit E the acreage accorded to each revegetation type (Grassland, <br /> Mountain Shrubland, Mixed Conifer, Riparian). For revegetation types with more than one <br /> seed/plant mixture anticipated, please break down the total acreage for that revegetation <br /> type by seed/plant mixture. <br /> Response: Exhibit E has been revised to include a table listing the acreage associated with <br /> each revegetation type. Revegetation types with multiple species lists based on water <br /> availability also have the acreage specific to each species list. <br /> 59) In Exhibit E, please state whether the operation anticipates applying fertilizer for <br /> reclamation. If so, please specify types, mixtures, quantities, and time of application. <br /> Response: The operation does not anticipate using any fertilizers. <br /> 60) Exhibit E does not provide any details on reclamation of stormwater management <br /> structures. Please provide this information in Exhibit E, or state where this information can <br /> be found in the application. <br /> Response: A discussion on the reclamation of stormwater management structures has been <br /> included in Exhibits E and G. <br /> EXHIBIT F <br /> 61) On Figure F-2, for the inset cross-section. please include the following: <br /> a) Insetlabel <br /> b) Highwall bench slope angle (63°) <br /> c) Recommended catch berm height(4 feet) <br /> Response: Figure F-2 has been revised to include labels on the inset cross-section. <br /> 62) Please either remove the Scale House label from Figures F-1 and F-2, or revise the label to <br /> clarify the scale house will be removed during final reclamation. For example, if the <br /> Applicant wishes to keep the label, it could be changed to "Reclaimed Scale House Area". <br /> Response: Figures F-1 and F-2 have been revised to more clearly demonstrate that the <br /> scale house will be removed, and the area will be reclaimed. <br /> 63) Please provide additional figures in this exhibit that better show reclamation details for the <br /> proposed mining area. These figures may be replications of Figures F-1 and F-2, but with <br /> closer views of the proposed mining area, and less view of the access road. <br /> Response: Additional figures have been added to Exhibit F showing a larger scale view of <br /> the quarry area. <br /> Hitch Rack Ranch Quarry(M-2017-049) <br /> Response to Comments—March 9,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.