Laserfiche WebLink
/ w <br /> PHASE 2 - NORTHERN UNDERDRAIN LINE <br /> 5 <br /> (SEE INDEX SHEET C6) / / ? -`- <br /> �7 <br /> LJ J <br /> `___-_- - // / GRAPHICAL SCALE IN FT: <br /> / 0 25 50 100 z ' <br /> EXISTING TEMPORARY PVC PIPE FOR '�� STA. 4+00.00 /f // z <br /> GROUNDWATER MONITORING WELL (TYP.) / TIE ROCK TRENCH APPROXIMATE TERMINATION / <br /> INTO BEDDING OF / OF ROCK TRENCH _ <br /> / UNDERDRAIN PIPE / N=116,889.51 I <br /> EXISTING 12" PERFORATED z <br /> APPROXIMATE EDGE OF N=116,783.61 ( E=211,869.64 UNDERDRAIN PIPE INSTALLED / I 4 <br /> / WETLAND VEGETATION 487 E=211,751.08 \ AS PART OF PHASE 1 REMOVE EXISTING CLEANOUT AND <br /> / 1 (SEE INDEX SHEET C3) INSTALL NEW 4' DIA. MANHOLE <br /> \ EXISTING CONTOURS(TYP.) // / , TIE IN EXISTING 12" PERFORATED <br /> \ 1 STA. 4+19.53 LINE THAT WAS INSTALLED AS PART <br /> PHASE 2 - MANHOLE 02 1 OF PHASE 1 TO MANHOLE <br /> \ PHASE 2 - MAIN UNDERDRAIN LINE / INSTALL 4' DIA. MANHOLE ) 2 1 <br /> 12" PERFORATED SDR35 PIPE LOCATION OF EXPLORATORY TRENCH RIM ELEV= 4872.5 TEMPORARY NORTH-SOUTH --�-/ STA. 0+00.00 <br /> (SEE THIS SHEET) FOR PHASE 2 UNDERDRAIN DESIGN I N=116,794.50 / ROCK TRENCH INSTALLED N 0,�� I PHASE 2 - MANHOLE /1 <br /> E=211,734.87 s• AS PART OF PHASE 1 TO REMAIN I <br /> (TO BE FILLED ONCE PHASE 2 INSTALL 4' DIA. MANHOLE (TYP.) <br /> / UNDERDRAIN HAS BEEN INSTALLED) 1 (SEE INDEX SHEET C3 FOR DETAILS) t I I <br /> (SEE DETAIL) <br /> 1 RIM ELEV 4872.0 1 <br /> 1 9+50 9+00 8+00 7+00 / 6+00 5+00 '•y 4+00 / 3+00 2+00 1+00 0+00 -0+40 N=116,560.52 1 W Z <br /> 11 / / I m• // �? E=212,083.09 1 Z Q <br /> / STA. 9+21.53 / / TEMPORARY EAST-WEST! I J Z <br /> / ROCK TRENCH TIED INTO Q <br /> END 12" PERFORATED PIPE / ROCK TRENCH INSTALLED <br /> NOTES <br /> / ® INSTALL TERMINATION WYE CLEANOUT / AS PART OF PHASE 1 TO REMAIN PIPELINE BEDDING OF J W <br /> t APPROXIMATE LOCATION UNDERDRAIN INSTALLED CL J <br /> AND CONCRETE COLLAR OF ROCK TRENCH TEE (SEE INDEX SHEET C3 FOR DETAILS) AS PART OF PHASE / 1. ANY DISTURBANCES TO ACCESS ROAD DURING CQ <br /> (SEE DETAILSMdr©) N-116,762.38 / ^ (SEE INDEX SHEET C3) CONSTRUCTION SHALL BE REPAIRED AND RESURFACED. C Z L� <br /> ® 43' N- <br /> E=211,727. 116,543.92 2. CONTRACTOR IS RESPONSIBLE FOR AS-BUILT SURVEY OF <br /> COTTONWOOD 1 IN=117,079.7e i / / <br /> LAND AND IE=211,321.80 / \ E=212,066.07 PROJECT COMPONENTS. ALL SURVEYING MUST BE N Q <br /> /, i PERFORMED BY A COLORADO LICENSED SURVEYOR. a <br /> FARMS LTD I / y l 3. DISTURBED AREAS TO BE REVEGEATED WITH THE W <br /> j ' 1 FOLLOWING SEED MIX THAT WAS APPROVED AS PART OF (n <br /> PHASE 2 - SOUTHERN UNDERDRAIN LINE /--4873 j I I / THE DRMS MINING RECLAMATION PLAN: Q W <br /> (SEE INDEX SHEET C5) / �� APPROXIMATE TERMINATION <br /> OF iROCK TRENCH CITY OF FORT COLLINS i SLENDER WHEAT 3.6 LBSIAC a <br /> E=211,658.75 PARK PLANNING AND 16.676.57 LODORN GREEN NEEDLE 3.6 LBSIAC Z <br /> THICK SPIKE WHEAT GRASS 3.6 LBSIAC <br /> DEVELOPMENT <br /> i SIDE OATS GRAMA 3.6 LBSIAC <br /> BO WESTERN WHEAT 2.7 LBS/AC <br /> UNNDDARY(VIP) INDIAN RICE GRASS 0.9 LBSIAC <br /> PROPERTY OWNER TOTAL 18.0 LBS/AC <br /> Z � U p <br /> Z <br /> < J d - <br /> 4880 4880 <br /> a INSTALL TERMINATION WYE CLEANOUT EXISTING GROUND ALONG O Z � N W Q <br /> AND CONCRETE COLLAR <br /> W GROUND EL. = 4873.0 = PROFILE CENTERLINE w_ � W f <br /> o: UTILIZE ON SITE SOIL MATERIAL 3 p r UTILIZE ON-SITE SOIL MATERIAL Z w <br /> g O Q Q ~ <br /> TO FILL EXISTING GROUND TO n i < <br /> MAINTAIN 3' OF COVER OVER PIPE I. �` TO FILL EXISTING GROUND TO g o N C <br /> Ix z <br /> 4875 PROPOSED GROUND z $ :�j chi MAINTAIN 3' OF COVER OVER PIPE g N Y^� 4875 LL c 0- <br /> ALONG CENTERLINE y<Ed ? o+ II v <br /> g ri in ?¢ o d<~2 LIJ C <br /> U <br /> `-- -- ..__ V W Z 0 <br /> a <br /> 0 <br /> 4870 4870 <br /> 500.0 LF. 12" PERFORATED SDR35 PVC O 0.10x <br /> 4 <br /> 415.5 L.F. 12" PERFORATED SDR35 PVC O 0.11x <br /> V <br /> INSTALL PERFORATED 12' PVC REMOVE EXISTING CLEANOUT AND <br /> PIPE PER TRENCH AND INSTALL NEW 4' DIA. MANHOLE <br /> BEDDING DETAILS, ) TIE IN EXISTING 12" PERFORATED <br /> 4865 LINE THAT WAS INSTALLED AS PART 4865 <br /> OF PHASE 1 TO MANHOLE ` <br /> TIE EXISTING ROCK INV. EL 4867.75 <br /> TRENCH INTO BEDDING OF <br /> �C w UNDERDRAIN PIPE w 'pb <br /> CL <br /> 4860 0 W< -S HORIZONTAL SCALE IN Fi: a.{ 4860 `C <br /> b a< N`S N GP s�►`" <br /> N~ O i m i ,4i N 0 25 50 100 < n D `0 0go <br /> < M S 00 17 W m M V' 00 W IM <br /> ffi¢ t0 ,n a co n pj<io VERTICAL SCALE IN FT: g a iAv RAWN BY: BAS <br /> 2 0 j%jAA <br /> a ~ N S iv + a Y o c' DESIGNED BY: BAS <br /> o °'16 A +z + a Z iv 0 1.5 3 6 _ CHECKED BY: aAA <br /> yc i N i w i _ > PROJECT NUMBER: <br /> 25 4855 wm?. w ? cn wm? 4855 COFC 2016.05 <br /> 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00 -0+40 DATE: <br /> r 03 07 201a <br /> V <br /> SHEET: INDEX: <br /> 6 C4 <br /> REVISIONS:---- <br />