Laserfiche WebLink
ROCK TRENCH TEE *e�� NOTES <br /> ~ \ END SOUTHERN N=116,762.38 1. ANY DISTURBANCES TO ACCESS ROAD DURING - `-=- <br /> ROCK TRENCH E=211,727.43 — �� _ 1\ l CONSTRUCTION SHALL BE REPAIRED AND RESURFACED. <br /> N=116,676.57 — �� \ I'll 2. CONTRACTOR IS RESPONSIBLE FOR AS-BUILT SURVEY OF _ <br /> GRAPHICAL SCALE IN FT: / E=211,658.75 95'��" "190. -`' 1 PROJECT COMPONENTS. ALL SURVEYING MUST BE _ - <br /> -- r"�- —�ii END NORTHERNl�o PERFORMED BY A COLORADO LICENSED SURVEYOR. <br /> ROCK TRENCHDISTURBED AREAS <br /> 0 25 50 100 `L_- 1 h 3 FOLLOWING SEED MIX TO <br /> HAR S THAT BE <br /> APPROVED REVEGEATEDTTH HE <br /> OF i <br /> I i _11 <br /> N=116,889.51 ll 1 THE DRMS MINING RECLAMATION PLAN: J s <br /> I / E=211,869.64 �1 Z <br /> SLENDER WHEAT 3.6 LBS/AC <br /> LODORN GREEN NEEDLE 3.6 LBS/AC <br /> THICK SPIKE WHEAT GRASS 3.6LBS/AC Q . <br /> SIDE OATS GRAMA 3.6 LBS/AC <br /> WESTERN WHEAT 2.7 LBSIAC <br /> INDIAN RICE GRASS 0.9 LBS/AC <br /> i NORTH-SOUTH ROCK TRENCH \ <br /> �� ' TOTAL 18.0LBS/AC <br /> INSTALLED FOR TEMPORARY <br /> I MITIGATION OF PONDED WATER \ l <br /> TRENCH SLOPE-0.10% \ , PHASE 1 OF UNDERDRAIN <br /> SYSTEM BUILT IN APRIL, <br /> \ I (SEE TRENCH DETAIL THIS SHEET) / <br /> 2017 AND AS-BUILT IN Q w o <br /> NOVEMBER, 2017. _j o <br /> EAST-WEST ROCK TRENCH �' \\\ t1 SHOWN FOR w 0 C4 <br /> i h ; INSTALLED FOR TEMPORARY STA. 14+24.07 \ INFORMATIONAL O <br /> MITIGATION OF PONDED WATER INSTALL IN-UNE WYE CLEANOUT \\ _ a <br /> III (j TRENCH SLOPE-0.10% NND116.86053� COLLAR \\ \\V1 PURPOSES ONLY ? p <br /> (SEE TRENCH DETAIL THIS SHEET) I E-212.083.08 \ , Z Lo <br /> Q p <br /> GEOTEXTILE FILTER WAS \ 1' Lu Z <br /> 1(1 STA. 17+44.63 WRAPPED AROUND ENTIRE \\ 'Ie 10 Q Q <br /> /1 END 12' PERFORATED PIPE / PIPE BETWEEN STA 11+00 J <br /> / INSTALL TERMINATION WYE CLEANOUT 1°3 <br /> / \ STUB OUT rr OF SOLID 12' PVC ON WESTERN END Q <br /> AND CONCRETE COLLAR / AND 12+00 RATHER THAN \ 1' a <br /> (/ N-116336.53 \ 11 OF MANHOLE AND PLUG FOR FUTURE EXTENSION <br /> I E-211,853.76 PLACED ON TOP OF TRENCH \ �1 (IF NECESSARY) d <br /> I ' BEDDING PER DETAILS Ill INV EL - 4867.61 STA. 11+01.77 <br /> 1 1 II 20+00 16+00 PHASE 1 - MAMHOLE 1 <br /> 1 19+00 18+00 17+00 INSTALL 4' DIA. MANHOLE <br /> a II I \ / 15+00 14+00 13+00 12+00 1• RIM. ELEV - 404" <br /> ROCK TRENCH TIED INTO UNDERDRAIN 11i 00 N-116,785.76 44 <br /> \ 1 1 1 E-212,313.61 4872. Y <br /> PIPELINE BEDDING AT STA 14+48 l 111 l Q <br /> Z Q W Z <br /> a -O <br /> .J ~ <br /> a5 4880 4880 TRENCH WIDTH 4.5 FT C <br /> INSTALL TERMINATION WYE CLEANOUT O } c <br /> N � ^� <br /> a PROPOSEDAND RETE COLLAR GROUND EL. - 4872,3 INSTALL AND CONCRETE <br /> LINE CWYEOLLAR <br /> CLEANOUT W N Z a w w 0 <br /> u 4872.12 PROPGO <br /> OSED GROUNDWEL - 4874-6 S� a <br /> 4871.79 c Z <br /> o UTILIZE EXCESS SOIL MATERIAL n i_¢Y NATIVE FILL-' _ _, _ VARIES O CC¢ Q = w <br /> 4875 c� FROM PIPE INSTALLATION TO m} (2 FT MIN.) LL G Q. Z r <br /> PROPOSED GROUND z FlLL EXISTING GROUND A ++ 4875 LL O 0 c C <br /> ALONG CENTERLINE n 3 IN.-4 IN - C ' <br /> Z MAXIMUM OF O.5' TO MAINTAIN <br /> EXISTING GROUND ALONG a w DRAINAGE ROCK O U <br /> _ 3� OF COVER OVER PIPE 6 IN. MIN. <br /> PROFILE CENTERLINE N i GEOTEXTILE FILTER4.5 FT MIN. } WQ C <br /> y -_--_- IN-BETWEEN G <br /> cn <br /> DRAINAGE ROCK x <br /> z -------'�- - ------ 9Al <br /> 2 FT MIN. <br /> o STUB OUT i OF SOUD 12' PVC ON WESTERN END OF <br /> MANHOLE AND PLUG FOR FUTURE EXTENSION (IF NECESSARY) 3 IN. <br /> IN. <br /> 4870 INV. EL. - 486i:6i 4870 DRAINAGE ROCK <br /> S 320.0 L.F. 12' PERFORATED SDR35 PVC O 0.10X67.45 <br /> EAST-WEST ROCK 1 Q <br /> 320.0 L.F. 12' PERFORATED INSTALL SCUD TRENCH DETAIL zlolg <br /> o SDR35 PVC O 0.10X INSTALL PERFORATED 12' PVC 12' PVC PIPECj� TY <br /> z TRENCH WIDTH - 4.5 FT �� - c G <br /> 0 <br /> 4865 4865tc �" +✓ Y <br /> W <br /> 0 <br /> J <br /> x r /;W.- L, <br /> NATIVE flLL _ 6 IN. MAX. <br /> z wJ a a w tD 3 IN.-4 IN. <br /> 4860 c co n ri a_ y DRAINAGE ROCK VARIES <br /> 3 pp 0< a S 4860 (2 FT MIN.) I qow <br /> HORIZONTAL SCALE IN FT: < 00 =< >i 4.5 FT MIN. <br /> < w z a< GEOTEXTILE FlLTE <br /> n w= n z n it n o IN-BETWEEN <br /> `y 0 25 50 100 F o wa d DRAINAGE ROCK DRAWN BY: SAS <br /> VERTICAL SCALE IN FT: a�++�n =n + �'�,�n a N-,mr 1 2 FT MIN. <br /> DESIGNED BY: SAS <br /> +ZGi^ �zG1 CHECKED BY: SAA <br /> cNi 0 1.5 3 6 c_' Z V)w j N j p=5 j o a j 3 IN <br /> IN. PROJECT NUMBER: <br /> N w? z N 99 N �m?� 4Zim? DRAINAGE ROCK V COFC 2016.05 <br /> 4855 - 4855 <br /> ° 20+00 19+50 19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 NORTH-SOUTH ROCK DATE: <br /> TRENCH DETAIL SHEET3/07 201I11DEX: <br /> 5 C3 <br /> REVISIONS:---- <br />