Laserfiche WebLink
SOUTH FAN <br />The south fan reclaimed runoff was controlled by alternate sediment control <br />measures. Three silt fences were utilized at the reclaimed south fan area and <br />one silt fence was located at the reclaimed south fan borrow area. A grass filter <br />design is presented in Appendix 14 -6 beginning on page 147. The grass filter <br />design demonstrates the silt fences at the south fan bench, south fan pile no. 10, <br />south fan pile no. 11 and the south fan borrow area are no longer required. <br />2 WEST PORTALS <br />The reclaimed 2 West Portals are in a small confined area with minimal <br />disturbance. See Exhibit 58. Runoff from individual reclaimed areas associated <br />with the 2 portals, the reclaimed overburden stockpiles and the reclaimed <br />substation was controlled by berms and silt fences. Details of these controls are <br />presented in Table 13 -5 with back up calculations in Appendix 14 -6. A grass <br />filter design is presented in Appendix 14 -6 beginning on page 147. The grass <br />filter design demonstrates the silt fences at the reclaimed overburden stockpiles, <br />the reclaimed substation and the reclaimed north and south portals are no longer <br />required. The drainage channel between the two portals was permanently <br />relocated as shown on Exhibit 58. <br />CAMEO REFUSE DISPOSAL AREA 3 (CRDA 3) <br />The Operator does not plan to construct CRDA -3 since the mine has been <br />sealed. <br />TR -64 13 -14 (Rev 05/13) <br />