Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 3 of 3 <br />Fill Holes with <br />Portland cement grout ( <br />na <br />na <br />1,065.00 <br />bag <br />$10.55 <br />$11,235.75 <br />Concrete <br />Bag, material cost <br />only ...94 lb. ba <br />Borehole Marker <br />Borehole <br />na <br />na <br />3.00 <br />EA <br />$3.67 <br />$11.01 <br />location/identification <br />marker (EA, material <br />cost only) <br />Cut Casing at <br />Exposed casing removal <br />10 <br />na <br />8.00 <br />LF <br />$1.77 <br />$14.16 <br />Surface <br />- Calculate <br />Circumference in Linear <br />Feet <br />Drill Rig Time <br />SCHRAMM T450WS <br />na <br />na <br />48.00 <br />EA <br />$201.62 <br />$9,677.76 <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />48.00 <br />EA <br />$58.14 <br />$2,790.72 <br />Time <br />Gal. <br />Job Hours: 177.00 Total Cost: $62,813.00 <br />CIRCES Cost Estimating Software <br />