My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_REVISION - C1981038 (14)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-02-15_REVISION - C1981038 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 12:55:00 PM
Creation date
2/21/2018 12:52:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/15/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
SL6
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task # TTT Page 2 of 3 <br />CIRCES Cost Estimating Software <br />Circumference in Linear <br />Feet <br />Drill Rig Time <br />SCHRAMM T450WS <br />na <br />na <br />12.00 <br />EA <br />$201.62 <br />$2,419.44 <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />12.00 <br />EA <br />$58.14 <br />$697.68 <br />Time <br />Gal. <br />Bottom Plug for <br />PVC plug - 6 in. <br />6 <br />na <br />1.00 <br />EA <br />$54.14 <br />$54.14 <br />Intermediate 6" <br />diameter borehole <br />Well <br />Fill Holes with <br />Portland cement grout ( <br />6 <br />na <br />51.00 <br />bag <br />$10.55 <br />$538.05 <br />Concrete <br />Bag, material cost <br />only ... 94 lb. bag) <br />Borehole Marker <br />Borehole <br />na <br />na <br />1.00 <br />EA <br />$3.67 <br />$3.67 <br />location/identification <br />marker (EA, material <br />cost only) <br />Cut Casing at <br />Exposed casing removal <br />6 <br />na <br />2.00 <br />LF <br />$1.77 <br />$3.54 <br />Surface <br />- Calculate <br />Circumference in Linear <br />Feet <br />Drill Rig Time <br />SCHRAMM T450WS <br />na <br />na <br />8.00 <br />EA <br />$201.62 <br />$1,612.96 <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />8.00 <br />EA <br />$58.14 <br />$465.12 <br />Time <br />Gal. <br />Bottom Plug for <br />PVC plug - 6 in. <br />6 <br />na <br />2.00 <br />EA <br />$54.14 <br />$108.28 <br />Dee 6" Wells <br />diameter borehole <br />Fill Holes with <br />Portland cement grout ( <br />6 <br />na <br />207.00 <br />bag <br />$10.55 <br />$2,183.85 <br />Concrete <br />Bag, material cost <br />only ...94 lb. bag) <br />Borehole Markers <br />Borehole <br />na <br />na <br />2.00 <br />EA <br />$3.67 <br />$7.34 <br />location/identification <br />marker (EA, material <br />cost only) <br />Cut Casing At <br />Exposed casing removal <br />6 <br />na <br />3.00 <br />LF <br />$1.77 <br />$5.31 <br />Surface <br />- Calculate <br />Circumference in Linear <br />Feet <br />Drill Rig Time <br />SCHRAMM T450WS <br />na <br />na <br />24.00 <br />EA <br />$201.62 <br />$4,838.88 <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />24.00 <br />EA <br />$58.14 <br />$1,395.36 <br />Time <br />Gal. <br />Bottom Plug <br />PVC plug - 10 in. <br />10 <br />na <br />2.00 <br />EA <br />$101.60 <br />$203.20 <br />GVB-10A - B <br />diameter borehole <br />Fill Holes with <br />Portland cement grout ( <br />na <br />na <br />330.00 <br />bag <br />$10.55 <br />$3,481.50 <br />Concrete <br />Bag, material cost <br />only ... 94 lb. bag) <br />Borehole Marker <br />Borehole <br />na <br />na <br />2.00 <br />EA <br />$3.67 <br />$7.34 <br />location/identification <br />marker (EA, material <br />cost only) <br />Cut Casing At <br />Exposed casing removal <br />10 <br />na <br />5.00 <br />LF <br />$1.77 <br />$8.85 <br />Surface <br />- Calculate <br />Circumference in Linear <br />Feet <br />Drill Rig Time <br />SCHRAMM T450WS <br />na <br />na <br />16.00 <br />EA <br />$201.62 <br />$3,225.92 <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />16.00 <br />EA <br />$58.14 <br />$930.24 <br />Time <br />Gal. <br />Bottom Plug Ex. <br />PVC plug - 10 in. <br />10 <br />na <br />3.00 <br />EA <br />$101.60 <br />$304.80 <br />Holes TR -49 & <br />diameter borehole <br />MR -124 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.