My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_PERMIT FILE - M2017036 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-02-15_PERMIT FILE - M2017036 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 9:05:34 AM
Creation date
2/16/2018 8:00:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
2/15/2018
Doc Name Note
Adequacy Review #3
Doc Name
Adequacy Review #3 Response
From
Telesto
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Jared Ebert <br />Date: February 14, 2018 <br />Page 5 <br />Cache La Poudre Ditch is within the Loveland soils unit. For the area south of the ditch <br />the Nunn soils unit is the primary unit with a small percentage in the Poudre soils unit. <br />For the mined area within the Loveland soils unit the A horizon material extends down to <br />15 inches and then transitioning into a C horizon. For the proposed mine area within the <br />Nunn soils unit, the A horizon extends down to 6 inches and the B horizon is from 6 to 29 <br />inches then transitions into a C horizon. For the proposed mine area within the Poudre <br />soils unit the A horizon extends down to 30 inches and the B horizon from 30 to 60 <br />inches. <br />The Loveland and the Nunn soils are designated as Prime Farmland if irrigated. In <br />order to preserve the high quality of the soil within these units, the A and B horizons <br />should be salvaged and stored separately from the C horizons. When it comes time for <br />soil replacement, the C horizons should be replaced separately and below the A and B <br />horizons. Please revise the soil salvaging, storage and replacement plan accordingly. <br />Specifically, please specify the range of depths the A/B horizons and C horizons will be <br />salvaged. Please indicate how and where the A/B horizons and the C horizons will be <br />stored separately. Please update the Exhibit C map to indicate where the A/B horizons <br />and the C horizons will be stored. Please revise the soil replacement plan so the subsoil <br />will be replaced separately and below the topsoil. <br />Response 21b <br />Data obtained from borings over the site indicate that there is sufficient material in the A <br />and B horizons to provide three feet of cover over the entire proposed disturbed areas. <br />All material from the C horizon that may be used as cover will be placed under three feet <br />of A and B horizon material. <br />The material from the A and B horizons will be stored in landscape berms and in <br />temporary stockpiles as shown on the updated Exhibit C drawings. Material from <br />landscape berms will be placed last over final areas to be reclaimed. All material from A <br />horizons will be removed first and placed at the outside edge of temporary stockpiles and <br />will be placed last over reclaimed areas, All material from the C horizon will be <br />processed through the plant and either used in the batch plant, used as liner material, or <br />placed under the three feet of cover material. <br />Response to DRMS Adequacy Review 3 comments T E L E S T O
The URL can be used to link to this page
Your browser does not support the video tag.