To: Jared Ebert <br />Date: February 14, 2018 <br />Page 17 <br />b. If LRM intends to dispose of any rubble generated by the demolition of mine <br />related structures onsite, they will need to identify where this material will be <br />placed. <br />c. Please provide the quantity of each item to be demolished. Below is a table <br />identifying the type of structure to be demolished and the unit of measure the <br />Division needs to estimate the cost to demolish the structure: <br />Item Unit of Measure <br />Building&Similar Structures Cubic Feet(L x W x H)of intact Structure <br />Process Plants &Mill Building Cubic Feet(L x W x H)of intact Structure <br />Floors, Slabs &Pavement Square feet(L x W) + estimated thickness <br />in inches <br />Footing&Foundations Linear feet+ estimated footer width and <br />height. <br />Walls Square feet(L x H) +estimated thickness <br />in inches. <br />Conveyors (portable)Dimensions (L, W, H) <br />Conveyors (non-portable) Cubic Feet(L x W x H) <br />Storage tanks(aboveground) Gallons <br />Storage tanks(underground) Gallons <br />Powerlines Liner Feet <br />d. Mining at the site will expose groundwater. Given this, the Division needs to <br />hold a bond to cover the cost of either backfilling the pit to a point above the <br />water table or a cost to isolate the pit from groundwater inflow by either <br />installing a clay liner or slurry wall. Given LRM's choice of the installation of <br />a clay liner as part of the proposed mining and reclamation plan, please <br />provide the information necessary to conduct an estimate of the cost for the <br />installation of the proposed clay liner assuming mining stops at the end of <br />Phase II. This cost should include the cost for placing and compacting the <br />clay material in lifts and for quality control measurements to insure the clay <br />material is installed at the proper compaction specification. Since the <br />material to construct the liner is found onsite, please also include a cost of <br />excavating the necessary material. <br />e. Please provide the information necessary to calculate the cost of the <br />installation of the French Drain and riser system. <br />f Please provide the anticipated maximum length of highwall to be in place at <br />any given time during mining of Phase I and II. Please provide an estimate of <br />the volume needed to grade this highwall to the proposed 3H::1 V slope. <br />g. Please provide a basis for the pit pumpdown costs. <br />h. Please provide an estimate of the volume of topsoil to be replaced. <br />Response to DRMS Adequacy Review 3 comments T E L E S T O