My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-02-15_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 10:49:35 AM
Creation date
2/15/2018 2:11:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/15/2018
Doc Name Note
Comments for Concentrate Shipping Building Record of Construction
Doc Name
Adequacy Review Response
From
CC&V / Newmont
To
DRMS
Type & Sequence
TR89
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. As -Built / Record Drawings: The problems with the drawings In in Appendix C.1 are <br />summarized in the table below. These problems must be corrected prior to the Division <br />accepting the certification report. (Note, it may be appropriate to Include more than one <br />engineering firm In the tide/revision block). <br />Drawing No <br />Is Scale <br />Correct? [Rule <br />6.2.1(2)(e)] <br />Stamped & Signed <br />by Colo. P.E.? <br />[Rules 6.2.1(2)(b), <br />7.3.2(2)] <br />Issued As -Built <br />/ Record Dwg? <br />[Rule 7.3.2(2)] <br />Errant North <br />Arrow? <br />[Rule 6.2.1(2)(e)] <br />All Text <br />Legible? <br />No <br />No <br />yes <br />no <br />yes <br />10-647-10 <br />0-647-26 <br />No <br />No <br />No <br />Yes <br />No <br />0-647-27 <br />No <br />No <br />No <br />Yes <br />No <br />0-647-28 <br />No <br />No <br />No <br />NIA <br />No <br />No <br />No <br />yes <br />Yes <br />No <br />10-647-85 <br />0-647-85-1 <br />No <br />No <br />yes <br />Yes <br />No <br />0-647-86 <br />0-647-87 <br />No <br />No <br />No <br />No <br />yes <br />yes <br />NIA <br />N/A <br />No <br />yes <br />0-647-88 I <br />No <br />No <br />yes <br />NIA <br />No <br />Response 3. As -Built 1 Record Drawings: The drawings have been updated with the <br />following corrections — <br />a. Scales have been removed from all drawings. <br />b. The North arrow has been further clarified on the drawings by stating 'Plant <br />North' which is a 44 degree clockwise rotation from true North. <br />C. The Illegible text has been corrected. <br />d. Drawings 20-647-26,20-647-27, and 20-647-28 are issued for 'Detailed <br />Design' as they apply to Phase II of the project and have not yet been <br />Issued for construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.