<br />Streeter Pond. Temporary Facilities Pond. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The Collom Haul Road construction was observed along the lower section of the road near the loadout. Scrapers <br />were working on adding fill material to ensure grade is met at the incline to the loadout. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />West Pit reclamation was stable and no signs of rilling or erosional features. <br /> <br />West Pit reclamation. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil Piles 21A, 21B, 21C, and 21D were inspected. Each pile has been seeded and shaped. No signs of erosion <br />were observed along the piles. Each pile was properly marked.