Laserfiche WebLink
February 8, 2018 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 6 <br /> <br />Fish Creek Tipple <br />pond <br />Y Y Culvert replaced as requested, <br />check dams along road recently <br />repaired <br /> <br />Fish Creek Borehole Y N mine water (flock <br />added) <br />Fish creek 3 cell pond , discharge at site 115 <br />triggers sampling at fishcreek <br />downstream. <br />18LT vent shaft <br />ponds <br />N N <br />Pond F Y N runoff from <br />facilities <br />Foidel Ice covered <br />Pond G Y N Surface Runoff <br />from laydown <br />Area <br />Foidel <br />Pond E Y Y delta at inlet is forming, cattails to <br />be cleared from around weep holes <br />at outlet <br />Area No. 1 Pond <br />(Pit Pond) <br />Y Y mine, sumps, <br />diversion dich <br />Pond D <br />Pond D Y Y Mine water <br />Pond B Y Y Bob pile Foidel Logs at flume have been removed <br />Pond C N N Cattails have been removed as <br />requested <br />Pond T N N laydown area Foidel v-notch weir, culvert under railway <br />always trickling <br />Water Treatment <br />ponds <br />Y Y (to <br />leach <br />field) <br />facilities water leach <br />field <br /> <br /> <br />Stream buffer zone <br />@ train load-out <br /> Barrels have been placed to protect <br />buffer zone, signs should be placed <br />east of the barrels to show extent <br />of buffer zone more clearly <br /> <br />The slurry excavation area near the wash plant was in use at the time of inspection due to cleaning of underflow