Laserfiche WebLink
Peabody Sage Creek Mine (C-2009-087) <br />MT- 2 <br />inches, and seeding and shrub transplants will be performed for providing erosion control and for <br />supporting the post mining land uses of rangeland, wildlife habitat, and recreation. <br />Section II - Revisions to the Permit <br />The following revisions have been submitted since the last midterm review of the Peabody Sage Creek <br />Mine permit application package. <br />Minor <br />Decision <br />Revisions <br />Descriptions <br />Submitted <br />Decision <br />Date <br />Wadge Valve House and Public <br />MR17 <br />Copy Location <br />2/25/2013 <br />Approved <br />2/28/2013 <br />MR18 <br />Midterm Review Responses <br />4/11/2013 <br />Approved <br />4/18/2013 <br />Little Grass Creek Wetlands <br />MR19 <br />Enhancement <br />5/15/2013 <br />Approved <br />5/23/2013 <br />Installation of a temporary mine <br />MR20 <br />dewatering system. <br />8/19/2013 <br />Approved <br />9/24/2013 <br />MR21 <br />Geologic Sampling <br />9/12/2013 <br />Approved <br />9/16/2013 <br />Installation of a concrete pad <br />MR22 <br />and a microwave tower. <br />9/19/2013 <br />Approved <br />10/7/2013 <br />Pump Discharge and Drainage <br />MR23 <br />Modifications. <br />11/18/2013 <br />Approved <br />11/22/2013 <br />MR24 <br />Update to 2.03 Exhibits. <br />12/6/2013 <br />Approved <br />12/10/2013 <br />DRMS Abandoned Mine Lands <br />MR25 <br />Drainage Repair Project. <br />6/13/2014 <br />Approved <br />6/18/2014 <br />Change to Company Ownership <br />MR26 <br />and Organization. <br />10/28/2014 <br />Approved <br />11/3/2014 <br />MR27 <br />MR27 was not used <br />- <br />- <br />- <br />MR28 <br />Change in Parent Company. <br />2/4/2016 <br />Withdrawn <br />4/21/2016 <br />Change in Permit Document <br />MR29 <br />Location. <br />8/9/2016 <br />Approved <br />8/31/2016 <br />Technical <br />Revisions <br />TR6 <br />Bond Reduction <br />5/15/2013 <br />Approved <br />6/7/2013 <br />Sump and Road As-Builts and <br />TR7 <br />Drainage Updates <br />7/15/2013 <br />Approved <br />9/26/2013 <br />Vegetation Success Criteria for <br />TR8 <br />Solid Waste Disposal Area. <br />12/1/2014 <br />Approved <br />1/15/2015 <br />Page 9 of 12 <br />