My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-12_REVISION - M1986002 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2018-02-12_REVISION - M1986002 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:36 AM
Creation date
2/12/2018 3:13:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
Revision
Doc Date
2/12/2018
Doc Name Note
Reclamation Costs Update and Notice of Surety Increase
Doc Name
Reclamation Costs Update and Notice of Surety Increase
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
SI2
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont’d Task # 03A Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br /> <br />Cycle Time: <br />Scraper Loading Time: 0.90 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 4700 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />0.830 <br />Travel Time: <br /> Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) Travel Time <br />(min) <br />1 1250.00 5.00 3.00 8.00 1381 0.97 <br />Haul Time: 0.97 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) Travel Time <br />(min) <br />1 1250.00 -5.00 3.00 -2.00 2938 0.50 <br />Return Time: 0.50 minutes <br />Total Scraper team cycle time: 2.97 minutes <br />Adjusted for job conditions: 632.14 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 632.14 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,264.28 LCY/Hour <br />Unadjusted unit production/hour: 761.62 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 27.68 Hours <br /> <br />Unit cost: <br /> <br />$1.122 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$39,276 <br />
The URL can be used to link to this page
Your browser does not support the video tag.