My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-12_REVISION - M1986002 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2018-02-12_REVISION - M1986002 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:36 AM
Creation date
2/12/2018 3:13:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
Revision
Doc Date
2/12/2018
Doc Name Note
Reclamation Costs Update and Notice of Surety Increase
Doc Name
Reclamation Costs Update and Notice of Surety Increase
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
SI2
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont’d Task # 03A Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br /> <br />Task description: Finish placement of overburden and wash fines <br />Site: Craig Ranch Pit Permit Action: 2018-01 Permit/Job#: M1986002 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 03A State: Colorado Abbreviation: None <br />Date: 2/6/2018 County: Mesa Filename: M002-03a <br />User: ACY <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 627G w/push-pull <br />-Dozer: Cat D8T - 8SU <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D8T - 8SU <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 NA 100 NA NA <br />Ownership cost/hour: $99.75 $83.81 NA $83.81 NA NA <br />Operating cost/hour: $118.23 $66.17 NA $66.17 NA NA <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA $0.00 NA $0.00 NA NA <br />Ripper op. cost/hour: NA $0.00 NA $0.00 NA NA <br />Operator cost/hour: $41.46 $40.52 NA $40.52 NA NA <br />Unit Subtotals: $259.44 $190.50 NA $190.50 NA NA <br />Number of Units: 4 1 0 1 0 0 <br />Group Subtotals: Work: $1,228.26 Support: $190.50 Maint: $0.00 <br />Total work team cost/hour: $1,418.76 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 35,000 CCY Swell factor: 1.000 <br />Loose volume: 35,000 LCY <br />Source of estimated volume: Table L-1 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,700 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Sand and clay - Loose Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 19.56 LCY Adjusted Capacity: 18.85 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.