Laserfiche WebLink
"ADDITIONAL CONTRIBUTIONS OF SUSPENDED SOLIDS TO STREAMFLOW OR TO <br />RUNOFF OUTSIDE THE PERMIT AREA" AS REQUIRED BY RULE 4.03.1(1)(B). <br />OUTFALL OF CULVERTS YA-6, WHERE DOWNCUTTING HAS RESULTED IN A 6" <br />GULLY EXTENDING BEYOND THE PERMIT BOUNDARY LINE; MATERIAL FROM <br />ROAD FILL HAS WASHED INTO SCOTHMAN'S GULCH. <br />Status: This NOV was issued on May 27, 2011 and terminated on June 23, 2011. <br />SECTION II — REVISIONS TO THE PERMIT <br />Minor Revisions, Technical Revisions, Permit Revisions, and Bond Release approvals which <br />have been made to the Yoast Mine permit since the last renewal (RN -3) are listed below. <br />Revision No. Approval Date Nature of Revision <br />4 <br />MR36 <br />12/21/2010 <br />Ownership Update <br />No Change <br />MR37 <br />04/13/2011 <br />Exploration Drilling <br />No Change <br />MR38 <br />08/13/2012 <br />Surge Structure Installation <br />No Change <br />MR39 <br />09/05/2012 <br />Rock Mulch Application <br />No Change <br />MR40 <br />10/22/2012 <br />Permanent Features Update <br />No Change <br />MR41 <br />10/24/2012 <br />Shrub and Tree Planting Update <br />No Change <br />MR42 <br />02/24/2013 <br />Public Copy of Permit Location <br />No Change <br />Change <br />MR43 <br />01/29/2014 <br />Owner, Operator, and Director <br />No Change <br />Update <br />MR44 <br />12/31/2014 <br />Update of Contact Information <br />No Change <br />MR45 <br />04/21/2016 <br />Change in Parent Company <br />No Change <br />MR46 <br />01/13/2017 <br />Sediment Pond Capacity Survey <br />Frequency <br />TR48 <br />09/16/2011 <br />Aspen/Woody Plant Density <br />No Change <br />Standard <br />TR51 <br />02/09/2012 <br />Identification of Areas of <br />No Change <br />Instability <br />TR52 <br />05/01/2013 <br />Post -Mining Land Use Change <br />No Change <br />TR53 <br />06/27/2013 <br />Midterm MT4 Responses <br />+$56,776.26 <br />SL3 <br />02/21/2012 <br />Partial Phase II Release Request <br />No Change <br />SL4 <br />12/19/2012 <br />Partial Phase I Release Request <br />No Change <br />SL5 <br />04/09/2014 <br />Partial Phase I, II, and III Release <br />-$1,493.63 <br />Request <br />SO1 <br />02/11/2016 <br />Transfer of Ownership <br />No Change <br />SECTION III — STATUS OF STIPULATIONS <br />The stipulation history associated with the Yoast Mine was reviewed as part of this Midterm <br />Review process. The following is a discussion of the stipulations that were noted as active or <br />issued as a result of the last Permit Renewal (RN -3). The review included an investigation of the <br />Yoast Mine -5- 02/05/2018 <br />