Snowcap Coal Company, Inc. <br />-13- 2017 Annual Reclamation Report <br />the last two quarters of 2007. These acres include all back filled and <br />graded areas along with buildings and asphalt areas that were approved <br />for retention through PR -3. The east end of the Conveyor Tunnel was <br />backfilled and filled with a 2 foot concrete plug. Due to inclement weather <br />and frozen soils, seeding was postponed until the 1St quarter of 2008. <br />Phase I Bond Release was approved on 13.5 acres with SL -4 on January <br />11, 2009. These 13.5 acres achieved final Phase II & III Bond Release <br />with SL -6 on December 14, 2010. Located in the SW% & SE% Section <br />34, T10S, R98W, 6th P.M. <br />Area - 13.5 acres reclaimed <br />(9.6 acres backfilled and graded) <br />(6.4 acres top soiled) <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final contours and <br />seeded in 2011. Phase I Bond Release was approved on 0.5 acres with <br />SL -8 on November 14, 2015. Phase II & III Bond Release was approved <br />on 0.5 acres with SL -9 on January 3, 2017. Located in the SW% & SE% <br />Section 34, T10S, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - October 2011, October 2014 (re -seeded) <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components - 2011 <br />"Salt Tolerant Seed Mix, Table 14-15" — 2014 <br />Phase III Bond Release - 0.5 acres <br />Pond 9 was backfilled, graded to final contours and seeded in 2013. <br />Phase I Bond Release was approved on 0.4 acres with SL -8 on November <br />14, 2015. Phase II & III Bond Release was approved on 0.4 acres with <br />SL -9 on January 3, 2017. Located in the SWY4 Section 34, T10S, R98W, <br />6th P.M. <br />Area - 0.4 acres <br />Date - April 2013 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release - 0.4 acres <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and Water <br />Tank (Light Use Road #1 ) - Portions of Light Use Road #1, as approved <br />by PR -3, was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 1.9 acres with SL -4 on January <br />11, 2009. Located in SEY4 Section 34, T10S, R98W, 6th P.M. <br />Area - 1.9 acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />31. Railroad Loop Track (South of 19/10 Road) - The Railroad Loop Track <br />that lies south of 19/10 Road was removed, regraded, backfilled and <br />seeded. This 0.3 acre area was part of the 2.1 acres that achieved final <br />