Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-12- 2017 Annual Reclamation Report <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Phase I Bond <br />Release was approved on 2.9 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.9 acres with SL -8 on <br />November 14, 2015. Located in the SE'/, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 2.9 acres <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and re- <br />seeded. Phase I Bond Release was approved on 2.2 acres with SL -2 on <br />October 27, 2003 and on 0.5 acres with SL -5 on November 5, 2009. The <br />0.5 acres achieved final Phase II & III Bond Release with SL -5, approved <br />on November 5, 2009 and the 2.2 acres achieved final Phase II & III Bond <br />Release with SL -7, approved on April 26, 2011. Located in SE%, Section <br />27 and NWY4, Section 34, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.6 acres with SL -4 on January <br />11, 2009 and on 1.0 acres with SL -5 on November 5, 2009. A total of 1.3 <br />acres in this area achieved final Phase II & III Bond Release with SL -5 on <br />November 5, 2009. Located in SEY4, Section 27 and NWY4, Section 34, <br />T10S, R98W, 6th P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substation A - Superstructures, fences, slabs and components removed <br />during 2007. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.2 acres with SL -4 on January <br />11, 2009. Located in the SE'/ Section 34, T10S, R98W, 6th P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under 1-70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR -3). 13.5 acres were reclaimed during <br />