My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2018-02-05_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 7:36:30 AM
Creation date
2/6/2018 6:58:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/5/2018
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2017
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-12- 2017 Annual Reclamation Report <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Phase I Bond <br />Release was approved on 2.9 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.9 acres with SL -8 on <br />November 14, 2015. Located in the SE'/, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 2.9 acres <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and re- <br />seeded. Phase I Bond Release was approved on 2.2 acres with SL -2 on <br />October 27, 2003 and on 0.5 acres with SL -5 on November 5, 2009. The <br />0.5 acres achieved final Phase II & III Bond Release with SL -5, approved <br />on November 5, 2009 and the 2.2 acres achieved final Phase II & III Bond <br />Release with SL -7, approved on April 26, 2011. Located in SE%, Section <br />27 and NWY4, Section 34, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.6 acres with SL -4 on January <br />11, 2009 and on 1.0 acres with SL -5 on November 5, 2009. A total of 1.3 <br />acres in this area achieved final Phase II & III Bond Release with SL -5 on <br />November 5, 2009. Located in SEY4, Section 27 and NWY4, Section 34, <br />T10S, R98W, 6th P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substation A - Superstructures, fences, slabs and components removed <br />during 2007. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.2 acres with SL -4 on January <br />11, 2009. Located in the SE'/ Section 34, T10S, R98W, 6th P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under 1-70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR -3). 13.5 acres were reclaimed during <br />
The URL can be used to link to this page
Your browser does not support the video tag.